background image

Read complete instructions before using ozone generator 

 

 

PLACEMENT AND SETTING OF MACHINE

 

 

1.  The OMZ-2500 is designed for universal application.  This unit can be utilized as a portable 

service unit, or as a stationary air purifier unit.  

2 a.  The OMZ-2500 controls feature an on/off switch powering the unit and fan and a variable 

ozone  dial.    Ozone  production  begins  when  both  the  variable  ozone  dial  and  main  switch  is 

turned ON. 

2 b.  (Setting Ozone Level) The right level is  when all the generated ozone is being used up 

accomplishing its job.  However, this is difficult to obtain because it becomes a balancing act.  

Initially the unit output is set high to get rid of the problem odor as quickly as possible.  As this is 

being  accomplished  less  ozone  is  required  for  the  diminishing  odors,  thereby  leaving  some 

residual ozone in the air.  If the unit output is not turned down, eventually a high ozone residual 

may occur.  If there is a heavy smell of ozone, then there is more ozone present than is required 

to do the job.  Simply turn the variable ozone dial down.  The levels of ozone required to clean 

most environments are from 0.03 ppm to 0.10 ppm.  This does not apply to shock treatment.  If 

a room requires shock treatment, turn the unit on high and ensure no humans or pets are in the 

room. Fish are okay. 

 

 

MAINTENANCE

 

 

Under heavy duty use or severely polluted areas, The OMZ-2500 should be inspected every 3 

to  4  weeks for fine  dust  or  oily  residue  collecting  on generator  surfaces  or  plates.   Clean  the 

particle filters using compressed air on the side of the unit by removing the retainer ring every 4 

weeks.  Light duty use requires cleaning every 4 weeks to 6 months depending on the severity 

of pollution and the humidity level. 

 

OZONE GENERATOR PLATE CLEANING INSTRUCTIONS

 

WARNING: HIGH VOLTAGE!

  Ensure that power supply is disconnected 

before starting any maintenance procedure or electrical shock injury may 

result. 

 

 

 

Ensure  that  the  unit  is  unplugged 

before servicing! 

 

1.  Locate  and  remove  four  screws  from  the  top  and 

bottom of the unit. Be very careful not to strip the screw 

holes when putting the screws back in. 

(Figure 1)

 

2. Gently slide out the generator chassis out from the 

PVC case 

(Figure 2+3).

 

 

 

 

Figure 1 

Отзывы: