background image

Safety Pads Assembly

Installation Time

 

You should allow approximately 20 minutes for this stage.

Step 1

Lay the Safety Pads on top of the trampoline, 

aligning the pad section joins with the joins in  

the frame.

Kneeling on the inside of the trampoline, feed the 

Elastic Toggles through the two eyelets so the 

loop end of the tie faces outwards and the toggle 

end is on the inside.

Step 2

Using a flat-head screwdriver (or similar), push  

the loop end between the wall panel and frame.

From underneath, insert the toggle into the  

loop and rotate to secure. Repeat for all ties.

Handy Hint

To create a gap between the wall and frame, you 

may need to insert your flat-head screwdriver and 

rotate to create a gap.

Step 3

To finish installing your pads, remove a single 

spring underneath where each pad section joins 

the next one. Then insert the spring through the 

loop on the underside of the pad and re-attach 

the spring. This will stop the front of the pads 

lifting up.

9

10

Enclosure Parts

Full Enclosure Assembly

Enclosure Poles

Quantity (Full Enclosure): 8 

Quantity (Half Enclosure): 4

Sleeved Netting  

with Foam Inserts

Quantity: 1

Содержание Rectangular In-Ground Trampoline

Страница 1: ......

Страница 2: ...ing parts Also ensure parts are safe and securely attached 3 Supervise children and inexperienced jumpers at all times taking extra care with younger children 4 Bare feet are the best and safest way to jump on a trampoline mat as they provide grip and avoid slipping 5 Jumping in the middle of the trampoline is the best and safest place to bounce 6 Always use safety padding on the frame to avoid in...

Страница 3: ...ntity 1 Elastic Toggles Quantity 16 Corner Section Plug Socket Quantity 1 Corner Section Plug Plug Quantity 1 Corner Section Plug Plug Quantity 1 Middle Section Plug Socket Quantity 2 Jump Mat Quantity 1 Self Tapping Screws Quantity 48 2 Extra Middle Section Socket Socket Quantity 2 Springs Quantity 104 Safety Pads Quantity 1 Wall Panels Quantity 4 4 Corner Holes Quantity 4 4 Corner Inner Holes Sp...

Страница 4: ...install you back fill around the outside of the hole with soil you have saved and re turf Step 2 The next step is to start digging the main hole for your trampoline frame and retaining wall This needs to be 25cm deep which is the right frame height The vented pads sit on top of the frame so they will be just above the grass level Step 3 The next stage is to dig the inner hole so that the trampolin...

Страница 5: ...frame will appear to bow outwards this is the design When the springs are attached the frame will pull inwards but the frame will always have a slight outwards bow 5 Frame Layout 14ft 4 25m x 10ft 3m 6 Frame Assembly 11ft x 8ft Middle Section Socket Socket Middle Section Plug Socket Middle Section Plug Socket Middle Section Socket Socket Corner Section Right Corner Section Left Corner Section Left...

Страница 6: ...h springs in the 12 6 3 and 9 o clock positions directly opposite each other Step 3 Finish by attaching the remainder of the springs Do this by attaching a few springs on one side then going to the other side of the trampoline to attach a few more This evens out the tension on the mat and springs Important During assembly it may look like the mat won t fit it will however stretch to the correct si...

Страница 7: ... wall panel and frame From underneath insert the toggle into the loop and rotate to secure Repeat for all ties Handy Hint To create a gap between the wall and frame you may need to insert your flat head screwdriver and rotate to create a gap Step 3 To finish installing your pads remove a single spring underneath where each pad section joins the next one Then insert the spring through the loop on t...

Страница 8: ...re poles into the sleeves Step 3 Insert each of the poles into the correct enclosure sockets through the 10cm slot between the pad sections Step 3 Insert each of the poles into the enclosure sockets on which ever side you want the net through the 10cm slot between the pad sections Step 4 Finally with the enclosure now half assembled and upright insert the remaining poles into the sleeves in positi...

Страница 9: ... 21 Leather St Breakwater VIC 3219 Hours Monday Friday 9am 5pm or by appointment Free Delivery Australia Wide Easy Returns Long Warranties Largest Range of Parts in Oz High Quality Built to Last Easy Claim Warranty Service Friendly Advice 7 Days a Week Round Oval and Inground Trampolines Trampolines and Replacement Parts Lay by Available ...

Отзывы: