Installation instructions
27
PROTECTING THE FUTURE
CB and ACS shall be connected via the cross-board. Fig. 15 shows
an arrangement of the cross-board on the upper module of the turnstile.
Check if the cables are reliably connected. Install the doors and lock them.
Подключение питания, пульта
управления и СКУД
Fig. 15.
Arrangement of the cross-board on the upper module of the
turnstile.
Fig. 16 shows external appearance of the cross-board and the
arrangement of connectors for connection of CB, ACS and S&FA.
Connection of power supply, the control
board and ACS
Содержание Praktika T-10
Страница 2: ...PROTECTING THE FUTURE...
Страница 7: ...Installation instructions 7 PROTECTING THE FUTURE Fig 1 Initial position of the leaves...
Страница 21: ...Installation instructions 21 PROTECTING THE FUTURE...
Страница 26: ...Full height turnstile Oxgard Praktika 10 T 10H 26 PROTECTING THE FUTURE Fig 14 220 V 12 V...
Страница 37: ...Installation instructions 37 PROTECTING THE FUTURE Fig 21 Sample for turnstile installation...
Страница 39: ...Installation instructions 39 PROTECTING THE FUTURE...