Turnstile CUBE C-03

 

Installation Manual

 

 

10

 

INSTALLATION AND DISMANTLING OF THE PRODUCT 

 

4.1  Equipment required 

Equipment to be used for the turnstile installation: 

1) 

electric perforating machine 

2) 

12  mm  carbide drill  bit  for  drilling  anchor  holes  in  the floor  (we  recommend  to  use the 

anchor with the screw of the FHII 12/15 SK type); 

3) 

S5 key for the screws with an internal hexagon; 

4) 

slot head screwdriver; 

5) 

plumb or level;  

6) 

steel shims for turnstile leveling; 

7) 

round file; 

8) 

side-cutting pliers. 

 

 

4.2  Installing the product 

ATTENTION: 

CAREFULLY  READ  THIS  SECTION  OF  THE  MANUAL 

BEFORE INSTALLING THE PRODUCT 

 

4.2.1 

Prepare a horizontal area at the product installation site. 

4.2.2 

Prepare a chase or cable conduit going from the site to the place 

of  installation  of  the  PSU,  CP  and,  where  necessary,  to  the  ACS  and  SFAS 

connection point. 

 

 

Содержание CUBE C-03

Страница 1: ...VOZROZHDENIE LLC OKPD 2 26 30 50 110 U 26 30 50 007 33120038 2017 APPROVED BY VZR 247800 001 LU TURNSTILE MODELCUBE C 03 VZR 247800 001IM INSTALLATION MANUAL 36 sheets 2020...

Страница 2: ...ing of the product 10 4 1 Equipment required 10 4 2 Installing the product 10 4 3 Dismantling the product 14 5 Connecting and setting the product 15 5 1 Power connection 18 5 2 Connecting the control...

Страница 3: ...he product Before installing the product please read the Operation Manual VZR 247800 001 OM as well Due to constant work on improving the product changes to its design may be made which are not repres...

Страница 4: ...starting installation work completely de energize the product IT IS FORBIDDEN TO INSTALL THE POWER SUPPLY MODULE INSIDE THE BODY OF THE TURNSTILE AS IT MAY RESULT IN AN INJURY OF THE HUMAN BEINGS DUE...

Страница 5: ...ucted on safety when working with electrical installations with voltages of up to 1000 V ATTENTION FAILURE TO COMPLY WITH THE SAFETY REQUIREMENTS SPECIFIED IN THIS SECTION CAN RESULT IN DEATH AND DAMA...

Страница 6: ...tation at negative temperatures the product should be held in a room with normal climatic conditions for 12 hours Loading and unloading operations should be carried out in compliance with safety regul...

Страница 7: ...ation Manual 7 3 3 2 Visually inspect the product There should not be visible damage on the product 3 3 3 If a damage is found prepare a Claim Report 3 3 4 Figure 1 overall dimensions of the turnstile...

Страница 8: ...ON INSTALL THE PRODUCT SECURELY IN CASE OF PRODUCT INSTALLATION ON LOW STRENGTH FLOOR TAKE MEASURES FOR FLOORS STRENGTHENING IN THE PLACE OF INSTALLATION Figure 2 when installing the turnstile it is n...

Страница 9: ...SSAGE ZONES SHALL BE ARRANGED TO ALLOW RECORDING OF PASSAGES DURING TURNSTILE OPERATION UNDER ACS CONTROL AND TO AVOID UNAUTHORIZED PASSAGES 3 5 1 Figure 3 turnstile passage zone arrangement and guide...

Страница 10: ...w of the FHII 12 15 SK type 3 S5 key for the screws with an internal hexagon 4 slot head screwdriver 5 plumb or level 6 steel shims for turnstile leveling 7 round file 8 side cutting pliers 4 2 Instal...

Страница 11: ...the turnstile stand anchors according to the installation dimensions Position of mounting holes relative to the external dimensions of the turnstile is shown in Appendix B The depth of the hole 120 mm...

Страница 12: ...4 2 6 Install the turnstile stand onto the prepared site 4 2 7 Route the cables from the CP PSU and if necessary ACS and SFAS cables into the turnstile body Secure the cables with cable ties The turn...

Страница 13: ...stile verticality in 2 planes if necessary use steel shims of required thickness for the turnstile correct installation Figure 6 Preparation to install the turnstile Fix the turnstile stand with three...

Страница 14: ...product 4 3 1 When sending the product for calibration or repair the product should be dismantled as follows 1 power off the product 2 disconnect the product from the power supply source 3 disconnect...

Страница 15: ...cessary contacts the turnstile should be partially disassembled This scope of works includes dismantling of the safety cover To do this it is necessary to undo two screws Figure 7 1 and four screws Fi...

Страница 16: ...rnstile mode it is necessary press and hold the BUT button until a short beep appears The turnstile operation mode is selected based on the number of short beeps it is necessary to release the BUT but...

Страница 17: ...VZR 247800 001 IM Turnstile CUBE C 03 Installation Manual 17 Table 1 shows the turnstile operation modes with different number of signals after pressing the BUT button...

Страница 18: ...ntrolled by the control panel the status of the buttons is transmitted to outputs ACCESS OUT p 5 4 2 2 switching between the impulse and potential control modes of the turnstile p 5 3 3 3 the turnstil...

Страница 19: ...stile is powered by 12 V DC power supply The maximum consumption is 1 5 A The PSU should be selected based on these parameters It should also be taken into account that voltage drop increases when the...

Страница 20: ...d via RJ 11 G 6P4C telephone socket to X24 socket with the PULT inscription using RJ12 6P4C telephone socket RJ12 6P4C RJ 11 G 6P4C Figure 9 The turnstile CP should be connected based on the contact i...

Страница 21: ...s the highest priority If the AP command was sent to this input the AP made contact with the GND contact the turnstile is in free passage mode and DOES NOT RESPOND to any commands other than STOP the...

Страница 22: ...rol signal is fed to LEFT RIGHT inputs Free passing mode can be set by sending control signals to both inputs simultaneously only in potential control mode Priority of LEFT and RIGHT inputs remains un...

Страница 23: ...and COM contacts are permanently closed or open in the hold mode and the D9 diode is constantly on Figure 10 To check the operation of the control board some LEDs are installed on it 1 D11 is indicati...

Страница 24: ...VZR 247800 001 IM Turnstile CUBE C 03 Installation Manual 24 Figure 10 Location of control LEDs on the motherboard Button Control LEDs...

Страница 25: ...Manual 25 Figure 11 To connect the controller it is necessary to remove the safety cover from the turnstile fold the board on swinging brackets make connections with the ACS and fix the wires to the p...

Страница 26: ...mode number 6 using the BUT button see Table 1 The turnstile does not respond to the control panel commands during this setting process and only transmits their status to the contacts of the ACCES_OUT...

Страница 27: ...utton 2 Status of the AP button 4 LEFT RIGHT STOP and outputs reflect current state of the CP buttons the transistor opens when a corresponding button is pressed LEFT RIGHT STOP and outputs can be con...

Страница 28: ...al 28 Figure 14 diagram for connecting the CP to the ACS controller The controller controls the turnstile in this variant using the LEFT RIGHT STOP and AP contacts Figure 14 Diagram for connecting the...

Страница 29: ...oduct readiness for use 6 1 1 Check the mounts of the turnstile parts and assemblies 6 1 2 Check that all cables are securely attached 6 1 3 Turn on the turnstile and perform health check by carrying...

Страница 30: ...resentative of the organization that performed installation demonstrates reliability of the product installation 2 notes on the product installation are made in the Product Service Record Section VZR...

Страница 31: ...han 25 meters it is mandatory to use a Cat5e or Cat6 twisted pair Total electrical resistance of CP DC power supply wire of should not exceed 50 Ohms If this requirement cannot be met additional 12V 1...

Страница 32: ...DIX B Position of mounting holes relative to the external dimensions of the turnstile Figure 15 position of mounting holes relative to the external dimensions of the turnstile Figure 15 Position of mo...

Страница 33: ...VZR 247800 001 IM Turnstile CUBE C 03 Installation Manual 33 APPENDIX C Turnstile connection diagram Figure 16 turnstile diagram and diagram of its connections Figure 16 Turnstile diagram...

Страница 34: ...VZR 247800 001 IM Turnstile CUBE C 03 Installation Manual 34...

Страница 35: ...VZR 247800 001 IM Turnstile CUBE C 03 Installation Manual 35...

Страница 36: ...VOZROZHDENIE LLC 192289 Saint Petersburg 66 Sofiiskaya str Telephone Fax 7 812 366 15 94 www oxgard com info oxgard com...

Отзывы: