MAINTENANCE INSTRUCTIONS
KMW200CCD
Version 1.1
USER MANUAL
KMW200CCD Chiller v1.1
Page
18
8. Maintenance Instructions
8.1 Filling the Reservoir with Water
Task Time:
10 minutes
When:
When the red FLOW light on the front panel is illuminated
Tools:
Bucket
Funnel
20 Litres of clean distilled water (maximum amount required if reservoir is empty)
Procedure
1. Switch off the KMW200CCD.
2. Remove the power supply plug from the MAINS IN socket.
WARNINGS
Ensure that the power is switched off at the mains and that the plug
has been disconnected from the mains power supply before removing
the top of the KMW200CCD. Dangerous voltages are present on the
KMW200CCD’s terminals when the power is on. Rotating parts are
exposed when the top of the KMW200CCD is removed when the
power is on.
3. Place a bucket beneath the overflow pipe of the KMW200CCD chiller unit.
4. Remove the water fill inlet cover.
WARNING
Do not allow water to splash on the electrical circuits of the
KMW200CCD. Failure to prevent water coming into contact with the
electrical circuits could cause an electrical shock hazard, and
possible damage to the equipment.
5. Using the funnel carefully fill the reservoir, trying to avoid splashing, until the water overflows
through the overflow pipe.
6. Refit the water fill inlet cover.
8.2 Cleaning the Water Filter
Task Time:
30 minutes
When:
Once a year (dependant on water quality and length of KMW200CCD operation)
Tools:
Screw driver
Bucket