background image

10400287-002 03/2011

©2010-11 Overland Storage, Inc.

Page 2 of 7

Quick Start Guide

The included rail kit is adaptable for installation in squared-holed 
and round-holed 19-inch (EIA-310) racks.
The rails are not universal. They are stamped LH (left) and RH 
(right) and must be mounted on the appropriate side (when facing 
the rack front).

NOTE: While the rail length can be shortened, any two-post telco-style 
or other rack that is less than 29-inches in depth will NOT support this 
server. Also, for threaded-hole racks, we recommend using a shelf.

Attach Inner Rails to Chassis

This procedure is required for 

all rack types

:

1.

Mark the 

screw holes

 on the rack where the rails will be 

installed.

NOTE: Be sure rear holes are horizontally in line with the front 
holes to ensure the unit remains level.

2.

Remove the 

inner rail

 from the rail set:

a.

Fully extend the 

rail set

.

b.

Push the inner member 

latch

 down, and remove the 

inner rail

c.

Release and slide the 

middle member

 back into the 

outer member.

3.

Attach the 

right inner member

:

a.

Facing the chassis, position the 

rail

 against the right side 

of the server with the locking tabs going through the holes 
on the rail.

b.

Slide the rail 

toward the front

 to lock it.

This may require some force as it is a tight fit.

c.

Secure the rail with its Phillips 

screw

.

4.

Repeat 

Step 3

 to install the 

left inner member

.

IMPORTANT:  Depending on your rack type, continue with either 
the 

“Square-Holed Rack Installation”

 or 

“Round-Holed Rack 

Installation.”

Square-Holed Rack Installation

1.

Attach the 

left outer rail

 to the rack:

a.

Position the 

rail

 against the inside of the rack front rail 

with the hooks in line with the holes.

b. Insert

 the bracket front into the rack rail and 

press 

down

 so that the hooks catch.

The spring-loaded tabs will extend into the hole to prevent 
the rail from unhooking.

c.

Slide the 

rear segment 

of the bracket rearward until the 

hooks are in line with the correct holes.

d. Insert

 the bracket rear into the rack rail and 

press 

down

 so that the hooks catch and the tabs lock.

Adaptors

Screws

Left (LH) Rail

Right (RH) Rail

Inner Member Latch

Middle Member Latch

(Hidden)

Middle Member

Outer Member

Inner Member

Latch

Middle Member

Outer Member

Screw

Align Rear
Holes to Tabs

Hooks

Tab

Содержание SnapServer N2000

Страница 1: ...itry or static sensitive devices Step 1 Activate Your Warranty It is essential that you activate your warranty Technical and warranty support are not available until it is done 1 Note the product seri...

Страница 2: ...member a Facing the chassis position the rail against the right side of the server with the locking tabs going through the holes on the rail b Slide the rail toward the front to lock it This may requi...

Страница 3: ...3 Using the screws from the kit secure the front of the rail to the rack 4 Slide the rear rail segment rearward until the rear adaptor holes are in line with holes being used 5 Using the screws from...

Страница 4: ...y a column of different rotational speed drives If you are combining drives with different speeds use the figures below to plan where to place the disk drives Install Drives NOTE Do not remove the dis...

Страница 5: ...ust be physically connected to the network For load balancing connect them to the same switch on the same subnet with the switch set to auto negotiate For failover connect them to different switches o...

Страница 6: ...equires that name resolution services via DNS or an equivalent service be operational 1 Find the server name The default server name is SNAPnnnnnn where nnnnnn is the server number For example the nam...

Страница 7: ...Enter an IP address and a subnet mask then click OK 3 In SSM right click the server name and select Launch Web Administration 4 Log into the Web Management Interface In the login dialog box enter admi...

Отзывы: