Valve for return layering with actuator DN 25 Commissioning
13
138119084-V01.07.2020
1. Connect the phase to a terminal marked
L‘
2. Connect the switched phase to the terminal marked
L
of the desired relay in Illust. 10.
The connections
L
are the switching outputs of
the respective relay (R1 to R4).
During the subsequent configuration of your
controller, set the corresponding relay as
switching relay for the actuator of the valve for
return layering.
3. Connect the neutral conductor to a terminal marked
N
in Illust. 10.
6. Commissioning
1. Slowly open the isolating ball valve for storage cyl-
inder circuit return.
2. Slowly open the isolating ball valve for storage cyl-
inder circuit supply.
3. Connect your fresh water station to the power
supply.
4.
Configure the controller of your fresh water station
for the control of the actuator.
5. Check all couplings for leaks.
7. Maintenance
The product is maintenance-free.
8. Disposal
Directive 2012/19/UE WEEE:
Waste electrical and electronic components
(WEEE) must not be disposed of with do-
mestic waste, but must be dropped off at a
collection point of the recycling of electrical
and electronic appliances.
NOTICE
Risk of environmental pollution
Incorrect disposal (for instance with domestic
waste) may lead to environmental damage.
f
Dispose of packaging material in an envi-
ronmentally friendly manner.
f
Dispose of the components appropriately.
If no return or disposal agreement has been made,
dispose of the product yourself.
f
If possible, recycle the components.
f
Dispose of components which cannot be recycled
according to the local regulations. Disposal with
domestic waste is not permitted.
Содержание 138119012
Страница 1: ...Valves controls systems Operating instructions EN Valve for return layering with actuator DN 25...
Страница 2: ......
Страница 14: ......
Страница 15: ......
Страница 16: ...OVENTROP GmbH Co KG Paul Oventrop Stra e 1 59939 Olsberg GERMANY www oventrop com 138119084 V01 07 2020...