8
6 Installation
The pipework has to be flushed thoroughly before
installing the ball valve connector block
Observe warning advice under paragraph 2
(safety notes)!
– The connection threads of the ball valves are
equipped with protection caps. To avoid any
damage, they must only be removed shortly
before the installation of the dwelling station
“Regudis W”.
NOTICE
!
– Do not use any greasing agents or oils for the
installation, as these can destroy the seals. Any
dirt particles or grease or oil residues must be
flushed out before the ball valve connector
block is installed.
– When choosing the operating fluid, the latest
technical development has to be considered.
– Please protect against external forces (e.g.
impacts, vibrations etc.).
CAUTION
!
After installation, check all installation points for
leaks.
6.1 Installation “Regudis W HTU / HTU- Duo”
Item no.: 1341082
Provide for a peripheral distance of 100 mm towards
any obstruction.
Illustr. 6.1 Connection scheme ball valve connector
block
Bore holes:
A – Installation point ball valve connector block
B – Installation point dwelling station “Regudis W”
Distance to wall – centre ball valve: 42 mm
When installing the ball valve connector block into a
flush-mounted cabinet, the prefabricated fixing points
must be used.
7 Operation
Before putting the installation into operation, the
system has to be filled and bled with due
consideration of the permissible operating pressures.
8 Suitable for
Item no.: 1341082
−
Dwelling station “Regudis W HTU”
−
Dwelling station “Regudis W HTU- Duo”
Item no.: 1341185
−
Dwelling station “Regudis W HTF”
9 Maintenance
The ball valve connector block is maintenance-free.
Tightness and function of the ball valve connector
block and its connection points have to be checked
regularly during maintenance. The station must be
easily accessible.
10 General conditions of sales
and delivery
Oventrops general conditions of sales and delivery
valid at the time of supply are applicable.
6.2 Installation “Regudis W HTF”
Item no.: 1341185
Provide for a peripheral distance of 100 mm towards
any obstruction.
Illustr. 6.2 Connection scheme ball valve connector
block
Bore holes:
A – Installation point ball valve connector block
B – Installation point dwelling station “Regudis W”
Distance to wall – centre ball valve: 26 mm
When installing the ball valve connector block into a
flush-mounted cabinet, the prefabricated fixing points
must be used.