Ovation Grid-Lok Скачать руководство пользователя страница 17

Issue 1

 

Grid-Lok Installation Manual

 

15

 

Connect the 4mm twin tube from the Control Box to each of the 4 
table as below. Ensure that the tube with the grey strip is connected 
to the Red fitting and red distribution bar on the table. 

1. Remove the OEM CM602 table from the machine and replace with 
table assembly supplied in the Grid-Lok

TM

 kit 

2. Ensure that the Distribution bar Air connections are at the back 
when sliding the table into the machine  
3. Once the tables are in the machine, connect the tooling modules 
using 4mm pneumatic “curly” pipe to the Pneumatic Distribution bar. 
The RH bar (red connectors) on the distribution bar connects to the 
connection (red sleeve) of the tooling module. 
3. Pneumatic cables remain connected to modules when not in use. 

Manifold to 
modules 

Pin Up 
Connections 
 
Table A1 
 
Table A2 
 
Table B1 
 
Table B2 

CHAPTER 5  

Connecting up 

Содержание Grid-Lok

Страница 1: ...Grid Lok TM Installation Manual Panasonic CM602 402 placement machines www Ovation Products com...

Страница 2: ......

Страница 3: ...necting up Connections overview 11 Locating and fitting power and air connections 12 Table up to pressure sensor on control box 13 Manifold to modules 15 Pin up and pin lock air connections to table 1...

Страница 4: ...chine issues or failures subsequent to a Grid LokTM installation using this guide In all cases Ovation Products recommend the use of a properly trained engineer to complete the works The Installation...

Страница 5: ...are supplied with a number of typical components required to facilitate fitting Please make sure you have identified all parts required either included with your kit or fitted to the target machine C...

Страница 6: ...Tooling modules number dependant on exact kit CHAPTER 2 Kit description 4 Grid Lok Installation Manual Issue 1 Regulator kit and mounting bracket Power supply cable...

Страница 7: ...PTER 2 Kit description Machine connection 8mm tube Y fitting one per machine Control box to table 4 per machine Machine connection 10mm tube T fitting to 8mm reducer one per machine Table up air press...

Страница 8: ...SUPPLIES CONNECTED Before installing the equipment the target machine must be powered down and in a safe state All machine safety procedures must be followed Please ensure you are familiar with these...

Страница 9: ...ntroller location Fit the Grid LokTM 411_CTL controller as follows 1 The Grid LokTM 411_CTL controller fits in the front middle compartment of the CM602 machine It is recommended to remove the front f...

Страница 10: ...Grid Lok Installation Manual Issue 1 Air solenoid location Locate the air solenoid compartment on the LH side of the machine Remove door dial manifold and Digi one unit to gain easier access to CMs ai...

Страница 11: ...l 9 CHAPTER 4 Locating the kit Air solenoid location Locate the air solenoid compartment on the RH side at the rear of the machine Remove door dial manifold and Digi one unit to gain easier access to...

Страница 12: ...CHAPTER 4 Locating the kit 10 Grid Lok Installation Manual Issue 1 Aux power supply location Locate the Aux Power Supply on the RH side of the machine...

Страница 13: ...actual Grid Lok modules are not shown for clarity see the diagram on page 12 for more details Grid Lok TM 411_CTL Multi Table Control Unit Operator Interface Plug In Power Supply Pneumatic Trigger Inp...

Страница 14: ...Locate the Pneumatics chamber using the 8mm tube and Y connection supplied remove the tube from the Machine regulator and replace with tube provided connecting the Machine regulator to the Grid Lok r...

Страница 15: ...the assembled Y connection Connect the line removed from valve 8 to the 6mm open connection connect provided 4mm airline to 4mm adapter Connect the other end of 4mm line to the Control Box located in...

Страница 16: ...Connecting up Locating and fitting pneumatic connectors Table up to pressure sensor on control box Connect the 4mm tubes from the table up air valves to the control box as shown below Pressure sensor...

Страница 17: ...Grid LokTM kit 2 Ensure that the Distribution bar Air connections are at the back when sliding the table into the machine 3 Once the tables are in the machine connect the tooling modules using 4mm pne...

Страница 18: ...From the control Box feed the 4mm twin tube to each designated table Connect the tube with the grey strip to the Red distribution bar and the plain black tube to the silver distribution bar Table LH s...

Страница 19: ...interface comprises four toggle switches Set Reset To raise and lower the tooling pins in semi automatic mode Auto Manual Automatic or Semi Automatic mode NOTE The Set Reset switches are disabled if...

Страница 20: ...ir control regulator one turn anti clockwise 5 Press the Set button on the operator interface 6 If all the pins on the tooling modules do not raise fully press the Reset button on the operator interfa...

Страница 21: ...p timing air control regulator use the following procedure 1 Remove the cover from the 411_CTL control Box 2 Locate the 4 Control Boards 3 Adjust the potentiometer labeled D1 D2 D3 and D4 in the pictu...

Страница 22: ...CHAPTER 8 Technical reference 20 Grid Lok Installation Manual Issue 1 NOTE Preventive Maintenance Tasks are the only authorized maintenance tasks that may be carried out on the Grid Lok tooling system...

Страница 23: ...CHAPTER 8 Technical reference Issue 1 Grid Lok Installation Manual 21...

Страница 24: ...CHAPTER 9 Contacts Grid Lok Installation Manual Issue 1 22...

Страница 25: ......

Страница 26: ...Grid Lok TM Installation Manual www Ovation Products com...

Отзывы: