B-526-10N-E
29
106
107
116
121
(9)
①
Take off hex bolts (116) securing the front
cover and remove the locating pin retainer
(107).
②
Tur ning the locating pin hex nut (121)
(clockwise) and pull out two locating pins
(106).
102
HOIST
(10) Using the jacking screw taps provided in the
front cover (102), jack the front cover evenly and,
by carefully lifting it using a wheel crane or similar
equipment, remove it.
CAUTION: B e c a re f u l n o t t o a l l o w
excessive force to act on the
bearings.
HOIST
(11) Remove the rotors (201) and (202).
Because each rotor is integral with its shaft,
screw an eyebolt into the end face of rotor shaft
and, hoisting by a wheel crane or similar
equipment, slowly slide it in the direction of twist
until out.
207
NOTE:
Mark individual thrust rings (207) with
identification marks to ensure their cor-
rect installation with respect to respective
rotors at assembly.
Individual components are now accessible for inspection.
(12) For further inspection, proceed to disassemble the bottom cover according to the procedure given below:
①
Place the meter body sideways.
②
Take off hex bolts (116) and separate the bottom cover (103). The bottom cover and bearings are now
accessible for inspection.
Содержание ULTRA UF-II
Страница 67: ...B 526 10N E 67...