B-526-10N-E
28
SUPPORT BLOCK
GROUND
103
(5) Place the meter upright with the rear cover (103)
down (register face up). Apply a waste around
the meter to receive residual process fluid which
runs down.
CAUTION: When you place the meter
u p r i g h t , e x e r c i s e c a r e
to guard the surfaces in
contact with the bearing
b l i n d c o v e r s a g a i n s t
damage. (Avoid placing it
directly on the ground.)
118
354
111
(6) Take off eight fitting bolts (118) with hex key and
remove the sealing flange (111) and sealing plate
(354).
117
104
250
(7) Take off hex socket head bolts (117) and remove
the adapter (104).
NOTE:
When removing the adapter, remove it
vertically, exercising care to avoid
d a m a g e t o t h e s i g n a l m a g n e t
assembly (250).
214
250
(8) Take off hex socket head bolts (214) and remove
the signal magnet assembly (250).
NOTE:
Before loosening hex socket head
bolts, tuck a rag into the clearance
between the rotors to prevent them
from turning.
Содержание ULTRA UF-II
Страница 67: ...B 526 10N E 67...