30.
When both porch sections are
completed, lift Right Side Section
into place on deck beneath the side
top plate.
(Make sure to use the
correct right/left side
configuration.)
Attach Wall Trim/ Support to wall
with 3- 2 1/2” screws. Try to
conceal screws if possible. Screw
Side Top Plate into Front Extension
of Porch section with 3 - 1 1/4”
screws. Screw into corner brackets
and post to conceal screws.
31.
Align Porch Post so flush
with outside of decking. Secure
post to deck by toe-nailing with
3 -2 1/2” screws.
Note, drill pilot holes to prevent
post from splitting.
32.
Complete Left Side Porch
Section as per
Step 30 & 31.
33.
Locate the Bottom and Top Sections of the Dutch Door. The Bottom Section is larger than the Top
Section. Attach 2 Hinges to each section. Center Hinges should be positioned to edge of door trim to prevent
hinges from contacting each other. Use 2” & 3/4” black screws on hinge / door attachment as shown above.
Be careful not to strip screws when tightening. Attach Hinge on the door’s horizontal trim. Position the
Bottom Door in place. Use a 1/2” high spacer for the bottom and 3/8” on the left and 1/8” on the right. When
in correct position, attach hinges to Wall Trim / Supports with with 3 - 2” Black screws. (use only 1 Black 2”
screw until door has been corrrectly aligned, then complete remaining 2 screws)
1/2” gap
Center
Hinges
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 14
3/4” screw
2“ Screws
Important
: Hinge not
exactly as shown.
Door Trim
edge
4 1/2” Filler Strip
Doorway side.