26.
Position the
Rear Gable Wall
on top of the
Rear Top Plate. The Rear Gable can be
distinguished from the other two gables because it
has Designer Shingles protruding below frame.
Temporarily attach to walls and top plate with 2 - 2”
screws. Gables may need slight adjustment in
Step 38.
Complete attachment when correctly
aligned in
Step 38
with an additional 6 - 2” screws.
The Rear Gable Framing should sit flush with the
inside of the Top Plate. It should also be centered
sideways on the Top Plate.
HINT:
Use a straight edge to check the angle of
the Gable Framing and Top Plate. Both angles
should line up. Adjust gable accordingly. Attach
with 2 - 2” screws.
Designer Shingles on
outside face
Notch in peak of
Gable Framing
Notch
Straight Edge
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
3 - 2” screws
Screw Side Top Plate into
porch section with 3 - 2”
screws. Screw into
Corner Brackets and Post
to conceal screws.
Complete the other Porch
section at this time
25.
When both Porch Rail Sections
are complete, lift into place on
Playhouse Deck and beneath the Side
Top Plate.
(Window Side section will
have Narrow Filler Trim).
Position so Post is flush with Decking
on the side and recessed 1/2” in the
front. Attach wall support to playhouse
wall with 3 - 2 1/2” screws. Try to
conceal screws if possible.
Post Flush with
Decking on side
1/2” recessed
in front
Tack in place
refer to
Step 57.