![Outdoor living today 5' X 11' Breeze Walkway Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/outdoor-living-today/5-x-11-breeze-walkway/5-x-11-breeze-walkway_assembly-manual_1661303005.webp)
6.
Carefully lower E- Girder down into
notch of H-Side Girders. Be careful not to
twist the Girder when dropping down into
place. Lag screw(2) Girder to Post.
Lag screw
to Post
7.
Lift, position and Lag screw the
second E-Girder to Posts.
8.
On level ground, position 1
Main
Joist (D)
and 6
Stub Joists (I)
.Main
Joists are pre-marked for Stub Joist
and Blocking position.
E-Girder
E-Girder
Pre-marked for Stub
Joist placement
D
I
Notches facing down
Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 5
E