INSTALLATION GUIDE
Product code
I
n Al
I
n Cu
U
n
I
max Al
I
max Cu
U
max
VG03-0006
160 A
200 A
1000 V
-
-
-
Type
Screw size
Screw
1
M10
Tightening torque
M
50-70 mm²
10 Nm
20 mm
SW
1
5
(M
s
/ M
H1
/ M
H2
)
25-35 mm²
6 Nm
(output)
L
2
12 mm
Screw
2
M6
2,5-16 mm²
3 Nm
SW
2
3
-
-
Screw
3
-
Max. Input cable
70 mm²
SW
3
-
Max, Output cable
16 mm²
1,5 mm2
2,5 mm2
6 mm2
10 mm2
16 mm2
25 mm2
35 mm2
50 mm2
0
0 / 3 / 3
0 / 2 / 2
3 / 1 / 1
3 / 1 / 1
2 / 0 / 0
2 / 0 / 0
1 / 0 / 0
70 mm2
95 mm2
120 mm2
150 mm2
185 mm2
240 mm2
300 mm2
400 mm2
1 / 0 / 0
0
0
0
0
0
0
0
Product data
Product name
OJL-connector 200
Installation
DIN-rail and screw mounting
Cross-section of conductors and number of conductors/ space. ( S / H1 / H2 )
Connection
Stripping lenght (input)
L
1
The conductors number on table
refer only to industrially installed
terminals.
L
1,2
DIN-rail mounting
Set the connector to DIN-rail.
See picture.
Push until ”click”
Mounting with screw.
Max. Ø 5
Removing from DIN-rail
Release the slider part with
screwdriver. Lift the
connector.
Input
S
Output
H
1
Output
H
2
M
S
M
H2
M
H1
Screw
1
SW
1
Screw
2
SW
2
SW
1,2
Sc
re
w
1
,2
Connect the
input
conductor when cover is open. Can be used for both copper- or aluminium
conductors. Note! The Aluminium conductor is allowed only one conductor/one space.
With the Al-conductors, it's recommended to use anti-corrosion paste. (i.e. Penetrox)
We recommend a ferrule when using a fine-stranded conductor.
The branching conductors
H1
and
H2
can be connected also when
the cover is closed. Note! It's allowed use only Cu-conductors for
branching.