One Stop Systems
4U Value 5slot G3 Expansion Unit
15
1.7
Pre-Installation Information
Before using the One Stop Systems expansion unit, you should perform the following steps:
Inventory the shipping carton contents for all of the required parts
Gather all of the necessary tools required for installation
Read this manual
1.8
Tools Required for Installation
To complete the installation of the product you will need a Phillips-head screwdriver and ESD wrist strap to prevent electrostatic discharge.
1.9
Items List
Item
Qty
Description
1
1
Full-height PCI Express host card
2
1
1 or 2 meter shielded x16 PCIe cable
3
1 or 2
U.S. Standard 125V or 250V
4
1 set
Rackslide and Kit (Optional)
Содержание OSS-PCIE-4UV-5slot
Страница 6: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 6 ...
Страница 12: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 12 Rear View 1 3 2 Backplane 1 3 3 Host and 5 slot backplane ...
Страница 14: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 14 1 6 Parts ...
Страница 31: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 31 ...
Страница 40: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 40 ...
Страница 42: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 42 SLOT 4 PORT 20 SLOT 5 PORT 12 ...
Страница 78: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 78 6 2 pin aux power cable and pinouts ...
Страница 92: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 92 12 Enclosure Dimensions ...
Страница 93: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 93 13 Rackslide Mounting Position BOTH SIDES IDENTICAL ...
Страница 98: ...One Stop Systems 4U Value 5slot G3 Expansion Unit 98 ...