SECTION 4 - MACHINE OPERATION
3121213
– JLG Lift –
4-11
4.10 TIE DOWN AND LIFTING
Tie Down
When transporting machine, boom must be in the stowed
mode with turntable lock pin engaged and machine securely
tied down to truck or trailer deck. A lifting/tie down eye is pro-
vided at each of the four corners of the machine frame. In
addition, another four tie down eyes are provided on the
machine frame, one behind each of the four drive/steer
wheels.
Lifting
If it becomes necessary to lift the machine using an over-
head or mobile crane, it is very important that the lifting
devices are attached only to the designated lifting eyes, and
that the turntable lock pin is engaged.
A lifting/tie down eye is provided at each of the four corners
of the machine frame. When lifting the machine, each of the
four chains or slings used for lifting the machine must be
adjusted individually so the machine remains level when ele-
vated.
SECURE TURNTABLE WITH TURNTABLE LOCK BEFORE TRAVELING
LONG DISTANCES OR HAULING MACHINE ON TRUCK/TRAILER.
4.11 TOWING
The machine is not equipped with a tow package. Refer to
Section 5 for emergency towing procedures.
Содержание 150HAX
Страница 2: ......
Страница 36: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 16 JLG Lift 3121213 NOTES ...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 6 JLG Lift 3121213 Figure 4 3 Grade and Sideslope ...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121213 Figure 4 4 Lifting Diagram ...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121213 JLG Lift 4 13 Figure 4 5 Decal Installation Sheet 1 of 2 ...
Страница 66: ...SECTION 4 MACHINE OPERATION 4 14 JLG Lift 3121213 Figure 4 6 Decal Installation Sheet 2 of 2 ...
Страница 106: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 JLG Lift 3121213 Table 7 1 Inspection and Repair Log Date Comments ...
Страница 108: ......
Страница 109: ......