SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121213
– JLG Lift –
2-13
Tower Boom Sequence
1.
Place the machine on level ground and with the tower
boom in the stowed position. Identify the hydraulic valve
switch adjacent to the tower lift cylinder at the bottom
end (rear) of the tower base boom.
2.
Visually check the two valves in the turntable to ensure
the plungers are fully extended
.
SIDE VIEW: MAIN BOOM AND
TOWER BOOM ATTACH
TOP VIEW: BOOM ATTACH
TO TURNTABLE
Содержание 150HAX
Страница 2: ......
Страница 36: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 16 JLG Lift 3121213 NOTES ...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 6 JLG Lift 3121213 Figure 4 3 Grade and Sideslope ...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121213 Figure 4 4 Lifting Diagram ...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121213 JLG Lift 4 13 Figure 4 5 Decal Installation Sheet 1 of 2 ...
Страница 66: ...SECTION 4 MACHINE OPERATION 4 14 JLG Lift 3121213 Figure 4 6 Decal Installation Sheet 2 of 2 ...
Страница 106: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 JLG Lift 3121213 Table 7 1 Inspection and Repair Log Date Comments ...
Страница 108: ......
Страница 109: ......