SECTION 3 - MACHINE CONTROLS AND INDICATORS
3121213
– JLG Lift –
3-11
Figure 3-5. Platform Control Station
1. Platform Leveling Override
2. Drive/Steer Lever
3. Tower Telescope Lever
4. Start
5. Choke/Glow Plug Indicator
6. Ignition/Emergency Stop Switch
7. Main Telescope Lever
8. Tower Lift Lever
9. Engine Distress Indicator
10. Main Lift Lever
11. Broken Chain
12. Swing Lever
13. Axles Set Indicator
14. Horn
15. Steer Switch
16. Capacity Indicator
17. Engine Speed Switch
18. Pump Volume Switch
19. Wheel Speed Switch
20. Creep Speed Switch
21. Chassis Out of Level Indicator
22. Rotate Switch
23. Auxiliary Power Switch
24. Platform Overload
Содержание 150HAX
Страница 2: ......
Страница 36: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 16 JLG Lift 3121213 NOTES ...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 6 JLG Lift 3121213 Figure 4 3 Grade and Sideslope ...
Страница 64: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121213 Figure 4 4 Lifting Diagram ...
Страница 65: ...SECTION 4 MACHINE OPERATION 3121213 JLG Lift 4 13 Figure 4 5 Decal Installation Sheet 1 of 2 ...
Страница 66: ...SECTION 4 MACHINE OPERATION 4 14 JLG Lift 3121213 Figure 4 6 Decal Installation Sheet 2 of 2 ...
Страница 106: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 JLG Lift 3121213 Table 7 1 Inspection and Repair Log Date Comments ...
Страница 108: ......
Страница 109: ......