background image

3

Made in USA

Installation Instructions

©2017 Orion Energy Systems, Inc. All rights reserved. Orion and Light Years Ahead are trademarks/ 
service marks of Orion Energy Systems, Inc. Design modification rights reserved.    20180108

O ri o n   E n e rgy   Sy s te m s ,  I n c .           

orionlighting.com  

1. 8 0 0 . 6 6 0 . 9 3 4 0

Use this instruction to install a fixture wireguard in the 
field for the HBHS1 product series.

Components

HBHS1 Series Fixture (ordered separately) 

LED-HBHS-WG04-KIT-SP or LED-HBHS-WG04-KIT

NOTE: Kit includes: 2 Fixture wireguards, hardware 

(4 bolts, 4 nuts, 4 wireguard mounting plates, 4 

screws) (See Fig. A for provided hardware)

Tools Required for Installation 

-Cordless Drill with deep well socket 
attachment

Step-by-Step Instructions

HBHS1 G1/GA/H1/HA/I1 Fixture Wireguard Field Installation

Instruction Number: P-INT-X-406

1

Unpack components.

2

If fixture does not have a lens installed, move 

to Step 2. If fixture has a lens installed, remove 

end cap screws.  (See Fig. 1)

3

Place wireguard mounting plate on end of 

the fixture. If fixture has a lens installed, 

use screws from Step 1 to attach wireguard 

mounting plate in place. If fixture does not have 

a lens installed, use the screws provided in the 

hardware kit (See Fig. 2)

4

Repeat Step 3 for the other three mounting 

locations.

5

Place wireguards onto the fixture so they line 

up with the wireguard mounting plate holes. 

(See Fig. 3)

6

Insert the bolt and attach the nut to the bottom 

of the bolt to secure the wireguard in place. 

(See Fig. 4 and Fig. 5)

7

Repeat Step 6 for other 7 hardware locations. 

(See Fig. 6 for completed assembly)

8

Proceed to mount fixture per customer selected 

mounting method and complete electrical 

connections to NEC/local code.

A

2

4

5

1

3

WARNING!

 

 

Risk of fire or electric shock. To reduce risk 
of electrical shock, turn off power supply 
before installation or servicing.

1.  Field installers are responsible for recognizing specific site 

requirements and making adjustments to assure a complete, 
functional installation.

2. Make all power connections using UL listed components.

3. Electrical connections must be made by a qualified electrician

   

 and in accordance with NEC and local codes.

6

Отзывы: