Inspection Points (continued)

Inspection Points – Recirculation/

Blend Tank

Complete all of the inspections and checks described in the “Inspection 
Points – Tanks and Basins” section of this manual and then verify that the 
inspection points below are as follows:

1.

 Recirc valve: 

Verify the recirc valve is set so that the maximum 

water level in the tank matches the maximum liquid level as 
specified by the engineer. If the maximum liquid level is not on the 
plans, a general rule is to set it at 80% of the tank depth for straight-
walled tanks or 80% of tank volume for curve-walled tanks.

2.

 Stinger length: 

Adjust the length of the recirc valve stinger based 

on installation instructions. 

  a. Calculate the necessary 

stinger length adjustment 
using the equation (A+B)-16

or (A+B)-406 mm, where A 
is the distance from the MM 
valve invert to the top of the 
tank and B is the distance 
from the top of the tank to the 
100% discharge level. If the 
stinger needs to be lengthened 
to near or beyond the length 
of the cage, the cage will also 
need lengthening.

  b. Stinger Adjustment Dimensions:

•  A = Distance from invert of MM valve to top of tank
•  B = Distance from top of tank to the liquid level where 100% 

bypass is desired, typically 80% of the tank’s volume

•  C = Standard cage length: MM4 49 inches (1245 mm), fits 

stingers up to 36 inches (914 mm); MM6 57 inches (1448 
mm), fits stingers up to 40 inches (1016 mm)

•  D = Middle of ball (at the 100% discharge level)

 NOTE:

 There should be a minimum of 9 inches (229 mm) from the 

normal liquid level to the “RO” float.

 

Inspection Points – 

AdvanTex

®

 Filter Pods 

Your system may include AX100 filter pods (shown) or AX20 filter pods. 
For AX20 inspection points, see the residential 

Installation Manual

 and 

residential 

AdvanTex O&M Manual, 

provided in Appendix B.

1. 

Installation 
inspection: 

Verify 

the AX100 pod 
has been properly 
installed. Improper 
installation is 
usually indicated by 
the conditions listed 
below:

  •  Sidewall bowing — Check for any sidewall bowing in the pod. The 

bowing may cause excessive spacing between media sheets. If 
the spacing between the media sheets exceeds ½-inch (13 mm), 
cut the fiberglass rods for the correct media sheet spacing.

  •  Lid misalignment — Lid bolts will only go into the holes if the lid 

is lifted slightly and the bolts are partially inserted prior to closing 
the lid. 

2. 

Manifolds and Laterals: 

 Flush the manifolds and laterals. See the 

AX100 Treatment Systems Installation Manual

  and 

Field Maintenance 

Report Form

 in  

Appendix B for more information.  
For proper operation after flushing the manifolds and laterals, turn 
the ball valves to their correct positions and turn the spray nozzle 
turbines to point down.

3. 

System Pressure:

 Verify the pressure 

gauge is set to zero. If it is not, open 
the seal at the top and let the pressure 
equalize with atmosphere. Install the 
pressure gauge, turn on the recirc 
pumps, and set to 3.0 psi (20.6 kPa).

 

NOTE: 

On systems plumbed in parallel, adjust the pressure in 

all three pods at the same time to 3.0 psi (20.6 kPa) using the 
gate valve on the pod manifold.

4. 

Pod drainage:

 Verify that the pod drains easily. If the pod does not 

drain, check to see if the shipping plug has been removed from the 
pod outlet.   

5. 

Lid bolt installation:

 When you have finished inspecting all pods, 

remove the pressure gauge and secure the lids on the pods with the 
included lid bolts. 

B

A

Seated 

stinger 

cone

Stinger

Cage

C

D

Содержание AdvanTex AX100

Страница 1: ...Start Up and Maintenance of AdvanTex AX100 AX20 Commercial Wastewater Treatment Systems AdvanTex O M MANUAL 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco COMMERCIAL MANUAL O M...

Страница 2: ...on and treatment is our only job When you purchase an Orenco system you can be confident you have chosen the best equipment available Assistance In addition to providing quality equipment Orenco pride...

Страница 3: ...ints Recirculation Blend Tank 13 Inspection Points AdvanTex Filter Pods 13 Inspection Points Vent Fan Assembly 14 Inspection Points Distribution Valve 14 Housekeeping 14 Maintenance Tools Equipment an...

Страница 4: ...ion from AdvanTex filtrate returning from the flow splitter basin The harmless nitrogen gas is released freely back into the atmosphere Recirculation Blend Tank The recirculation blend tank reduces th...

Страница 5: ...nstallation of all equipment and the availability of power phone line and water at the site The AdvanTex Dealer is expected to be on site and is either performing the start up or acting as a coordinat...

Страница 6: ...tion Site drainage Verify that all riser lids external splice box lids and AX pod lids are level and above grade Serviceability Verify that there is a minimum of two feet of space between AX pods Chec...

Страница 7: ...control panel to assure proper system operation and component longevity 4 Power supply voltage Make sure the panel breakers are switched off and check the power supply voltage at the panel On 120 V pa...

Страница 8: ...er Inspect the riser attachment and rubber grommets for a watertight seal 4 Splice box Inspect the splice box for correct wiring and the use of waterproof splice nuts If there is water in the splice b...

Страница 9: ...TCOM control panels d Check the float settings provided in the plans against the actual float settings If the plans don t provide float settings and the engineer or system designer is unable to provi...

Страница 10: ...r cam lock fitting and open the discharge assembly ball valve i Switch the pump breaker s in the control panel to the ON position when finished Inspection Points Pumps When the panel has been inspecte...

Страница 11: ...3200 3 5 3 9 PF500512 5 4 6 2 PF100552 3 6 3 8 PF500532 2 6 3 0 PF100712 7 8 8 4 PF50053200 3 2 3 7 PF10073200 4 9 5 2 PF500534 1 3 1 5 PF100752 5 8 6 2 PF500552 3 3 3 9 PF101012 9 0 9 8 PF500712 7 3...

Страница 12: ...ur system before testing d Lower the float assembly into the tank and clip the float assembly into the float bracket Timed dose a Toggle the AUTO OFF MAN switch to the AUTO position b Record the timer...

Страница 13: ...of 9 inches 229 mm from the normal liquid level to the RO float Inspection Points AdvanTex Filter Pods Your system may include AX100 filter pods shown or AX20 filter pods For AX20 inspection points se...

Страница 14: ...location of all distribution valves in the system 1 Verify liquid level Make sure that the tank or basin that you are pumping from has sufficient liquid to perform the test WARNING There is no motor...

Страница 15: ...r gloves Trash bags Routine Inspection and Maintenance Biotube filter cradle OM BIOTUBECRADLE Beakers or bottles Calculator Channel lock pliers Dissolved oxygen DO meter or colorimetric ampoules 3 16...

Страница 16: ...istribute upon request To request multiple copies of this manual contact Orenco Systems Inc at 1 800 348 9843 With preventive maintenance and periodic inspections the wastewater treatment system will...

Страница 17: ...r biological growth on the spray nozzles Observe and measure the residual pressure Refer back to the Start up Operation section for initial measurements of residual pressure If the observed residual p...

Страница 18: ...E Turn the laterals in the AdvanTex treatment unit 180 degrees so the spray nozzle turbines face up prior to flushing to prevent nozzle clogging while material is being pushed along the lateral to the...

Страница 19: ...Recommended Activity Period Activity Visual Inspection of Tank Liquid Levels 1 Check Biotube Effluent Filters Clean as Required 1 Check Biotube Pump Vault Filters Clean as Required 1 Record Elapsed Ti...

Страница 20: ...itself Test the automatic function of the system as shown in the Start up Operation section of this manual to verify proper operation c Faulty floats If after checking the circuit breakers fuses and...

Страница 21: ...umping downhill A system will not necessarily siphon every time it operates It is dependent on the system design A siphoning system can be retrofitted with an anti siphon valve Most siphoning problems...

Страница 22: ...he splice box lid being careful not to drop the screws into the tank If the splice box was submerged or if there is a crack in the conduit there may be water in the splice box If this is the case remo...

Страница 23: ...______________________ __________________________________________________ __________________________________________________ __________________________________________________ ________________________...

Страница 24: ...________ __________________________________________________ __________________________________________________ __________________________________________________ ______________________________________...

Отзывы: