background image

Start-Up and Maintenance of 

AdvanTex

®

 AX100 & AX20 Commercial  

Wastewater Treatment Systems

AdvanTex

® 

O

&

M

 MANUAL

800-348-9843 • 541-459-4449  
www.orenco.com
www.vericomm.net

Orenco

®

COMMERCIAL

MANUAL

 

O

&

M

Содержание AdvanTex AX100

Страница 1: ...Start Up and Maintenance of AdvanTex AX100 AX20 Commercial Wastewater Treatment Systems AdvanTex O M MANUAL 800 348 9843 541 459 4449 www orenco com www vericomm net Orenco COMMERCIAL MANUAL O M...

Страница 2: ...on and treatment is our only job When you purchase an Orenco system you can be confident you have chosen the best equipment available Assistance In addition to providing quality equipment Orenco pride...

Страница 3: ...ints Recirculation Blend Tank 13 Inspection Points AdvanTex Filter Pods 13 Inspection Points Vent Fan Assembly 14 Inspection Points Distribution Valve 14 Housekeeping 14 Maintenance Tools Equipment an...

Страница 4: ...ion from AdvanTex filtrate returning from the flow splitter basin The harmless nitrogen gas is released freely back into the atmosphere Recirculation Blend Tank The recirculation blend tank reduces th...

Страница 5: ...nstallation of all equipment and the availability of power phone line and water at the site The AdvanTex Dealer is expected to be on site and is either performing the start up or acting as a coordinat...

Страница 6: ...tion Site drainage Verify that all riser lids external splice box lids and AX pod lids are level and above grade Serviceability Verify that there is a minimum of two feet of space between AX pods Chec...

Страница 7: ...control panel to assure proper system operation and component longevity 4 Power supply voltage Make sure the panel breakers are switched off and check the power supply voltage at the panel On 120 V pa...

Страница 8: ...er Inspect the riser attachment and rubber grommets for a watertight seal 4 Splice box Inspect the splice box for correct wiring and the use of waterproof splice nuts If there is water in the splice b...

Страница 9: ...TCOM control panels d Check the float settings provided in the plans against the actual float settings If the plans don t provide float settings and the engineer or system designer is unable to provi...

Страница 10: ...r cam lock fitting and open the discharge assembly ball valve i Switch the pump breaker s in the control panel to the ON position when finished Inspection Points Pumps When the panel has been inspecte...

Страница 11: ...3200 3 5 3 9 PF500512 5 4 6 2 PF100552 3 6 3 8 PF500532 2 6 3 0 PF100712 7 8 8 4 PF50053200 3 2 3 7 PF10073200 4 9 5 2 PF500534 1 3 1 5 PF100752 5 8 6 2 PF500552 3 3 3 9 PF101012 9 0 9 8 PF500712 7 3...

Страница 12: ...ur system before testing d Lower the float assembly into the tank and clip the float assembly into the float bracket Timed dose a Toggle the AUTO OFF MAN switch to the AUTO position b Record the timer...

Страница 13: ...of 9 inches 229 mm from the normal liquid level to the RO float Inspection Points AdvanTex Filter Pods Your system may include AX100 filter pods shown or AX20 filter pods For AX20 inspection points se...

Страница 14: ...location of all distribution valves in the system 1 Verify liquid level Make sure that the tank or basin that you are pumping from has sufficient liquid to perform the test WARNING There is no motor...

Страница 15: ...r gloves Trash bags Routine Inspection and Maintenance Biotube filter cradle OM BIOTUBECRADLE Beakers or bottles Calculator Channel lock pliers Dissolved oxygen DO meter or colorimetric ampoules 3 16...

Страница 16: ...istribute upon request To request multiple copies of this manual contact Orenco Systems Inc at 1 800 348 9843 With preventive maintenance and periodic inspections the wastewater treatment system will...

Страница 17: ...r biological growth on the spray nozzles Observe and measure the residual pressure Refer back to the Start up Operation section for initial measurements of residual pressure If the observed residual p...

Страница 18: ...E Turn the laterals in the AdvanTex treatment unit 180 degrees so the spray nozzle turbines face up prior to flushing to prevent nozzle clogging while material is being pushed along the lateral to the...

Страница 19: ...Recommended Activity Period Activity Visual Inspection of Tank Liquid Levels 1 Check Biotube Effluent Filters Clean as Required 1 Check Biotube Pump Vault Filters Clean as Required 1 Record Elapsed Ti...

Страница 20: ...itself Test the automatic function of the system as shown in the Start up Operation section of this manual to verify proper operation c Faulty floats If after checking the circuit breakers fuses and...

Страница 21: ...umping downhill A system will not necessarily siphon every time it operates It is dependent on the system design A siphoning system can be retrofitted with an anti siphon valve Most siphoning problems...

Страница 22: ...he splice box lid being careful not to drop the screws into the tank If the splice box was submerged or if there is a crack in the conduit there may be water in the splice box If this is the case remo...

Страница 23: ...______________________ __________________________________________________ __________________________________________________ __________________________________________________ ________________________...

Страница 24: ...________ __________________________________________________ __________________________________________________ __________________________________________________ ______________________________________...

Отзывы: