Step 2: Slide the Power Supply Module along the guide rail into the chassis.
Step 3: Snap the Power Supply Module on to the backplane in the chassis.
Step 4: Turn the two thumb screws clock-wise to secure the Main Control Module until they stops.
4.5 Installing GT48 onto a Standard Shelf
GT48 is designed to fit into a standard 19 inch shelf with standard 1U form factor. Its physical dimension is
4.4cm high x 43.8cm wide x 42.5cm deep.
Installation procedure is as follows
:
Step 1: Place a GT48 into an empty slot on a 19 inch shelf and identify the left and right hand.
Step 2: Use the screws in the shipping package to secure the GT48 onto the shelf, as illustrated in Figure 4-1.
Figure 4 - 1 Installing GT48 onto a 19 inch shelf
Step 3: The shelf and the hands will hold the GT48 in place.
Note:
¾
Ensure GT48 is horizontal.
¾
Ensure there is ample airflow space around GT48.
¾
Ensure enough space between two GT48s when multiple GT48s are installed.
4.6 Installing Cables
4.6.1 Connecting
Console
Port
There is a Console Port on GT48 for local configuration, management and diagnostics. Through the Console Port
cable, a PC can directly connect to it.
The Console Port cable in the shipping package has a RJ45 connector on one end for GT48 and DB9 on the
other end for a PC.