background image

WALL INSTALLATION

The weight of the Shower Core is approx. 30
kg. The surrounding structure must be able
to support the forces that will stress the at-
tachment points. Using the holes throughout
the back, the Mounting brackets are fixated
with screws hanging on the wall.

PREREQUISITES FOR INSTALLATION

Electrical Supply

Voltage and current rating:

220-240 V~ / 50 Hz / 16 A

Residual circuit breaker:

One per shower required. Having a rated residual tripping
current not exceeding 30 mA

Mains supply fixed cord:

Min. 2.5 mm

2

 (rated for 16 A circuit)

Connectivity

Internet connection:

Private 2,4 GHz Wi-Fi network

Circuit breaker:

One per shower required

Plumbing / Water

Hot and Cold Water Inlet:

Separate hot/cold inlet required - 1/2” BSPP (G) pipe connec-
tion needed

Temperature of inlet water:

Cold: +4°C to +30°C

Hot: +55°C to +70°C

Water inlet flow:

Min. 9 litres/minute hot and cold

Water pressure:

Min. 3 bar/43,5 psi/0,3 MPa measured at the highest point of
installation

Max pressure 10 bar/ 145 psi / 1 MPa

Hardness of Water:

Required: 3°dH-10°dH

Preferred: 6°dH-10°dH or a total hardness of 110-180 mg Ca-
CO3/litres

Pre-installation

6

Содержание Shower Standard R2

Страница 1: ...PRE I NSTALLATION O R B I T A L S H O W E R S T A N D A R D R 2 5 06 0002 Publication date 2020 05 06 ...

Страница 2: ...cument may be reproduced or copied in any form or by any means without written permission from Orbital Systems The English language version of this document contains the original in structions All other language versions are translations of the original instructions ...

Страница 3: ...uisites for Installation 6 Shower Installation Overview 7 Recycling Optimisation Site Suggestion 8 Pre Installation 9 Component Overview 9 Kit Measurements 10 Crucial Kit Measurements 11 Installation Scenario Displayed in Manual 11 Prepare Shower Area 12 Install Drain 14 Install Diverter Wall Bracket 16 Prepare OS Head Shower 17 Prepare 3rd Party Head Shower 17 Install Core Wall Mounting 18 Prepar...

Страница 4: ...This page is intentionally left blank ...

Страница 5: ...E U D E C L A R A T I O N O F C O N F O R M I T Y This system is certified by IAPMO R T to NSF 55 Class B Pre installation 1 ...

Страница 6: ... shower sys tem is designed for regular showering only Do not use the shower to clean extreme soil ing or pour corrosive chemicals or cleaners down the shower drain Any other use of the system could seriously deteriorate the quality of the filtration system or damage the show er system Do not drink the shower water Quality of the water is not guaranteed to meet drinking wa ter quality These instru...

Страница 7: ...led under strict standards Orbital Systems warranty covers defects which appear within a period of two years from delivery of the product Orbital Systems warranty does not cover Defects arising out of materials or a design specified by the Customer or by any alter ations carried out without our consent Defects that appear under conditions of operation not provided for and under im proper use of th...

Страница 8: ...ould you require product advice experience any problems need to purchase spare parts or to set up a service visit Repairs should always be carried out only by Orbital Systems Contact us support orbital systems com www orbital systems com Europe CET 46 0 40 619 55 50 Pre installation 4 ...

Страница 9: ... from the Core Unit needs to be built using 45 angles For example to achieve a 90 bend two pcs of 45 bends needs to be used No more than six 45 bends in total can be used when installing the Orbital Shower These limitations applies to both horizontal and vertical bends ORBITAL SHOWER STANDARD CONFIGURATION REQUIREMENTS D C W 450mm H 750mm D 150mm max 65 mm min 45 mm A min 100 mm B min 100 mm max 4...

Страница 10: ...ent not exceeding 30 mA Mains supply fixed cord Min 2 5 mm2 rated for 16 A circuit Connectivity Internet connection Private 2 4 GHz Wi Fi network Circuit breaker One per shower required Plumbing Water Hot and Cold Water Inlet Separate hot cold inlet required 1 2 BSPP G pipe connec tion needed Temperature of inlet water Cold 4 C to 30 C Hot 55 C to 70 C Water inlet flow Min 9 litres minute hot and ...

Страница 11: ...n to drain Ø75 mm Available Shower variants A OS Head Hand Shower B OS Head Shower C 3rd Party Shower 4 5 6 3 2 1 7 8 1 Shower Unit Core 2 Core Wall Fixture 3 Control Dial 4 Shower Head 5 Hand Shower 6 Hand Head Diverter 7 Drain Unit 8 Smart Sensor Unit and Sensor Tank Pre installation 7 ...

Страница 12: ...STION Recommended installation A fully enclosed shower space with floor heating is recommended to optimize recircu lation rates INFORMATION VALID FOR ALL SHOWER VARIANTS Picture displaying OS Head Hand Shower variant Pre installation 8 ...

Страница 13: ... Wall conduit 4 Core Wall Fixture Pan Head Stainless Steel Screw x8 5 Connection Pipe 6 Drain Unit Countersunk Stainless Steel Screw x5 7 Frame 8 Grating 9 Chrome conduit domed end cap 10 Outlet Unit OS provides requested 11 Hand Head Diverter kit Countersunk stainless Screw x3 12 Pipe Clamps x2 13 Pipe Support Sleeves 14 Wall box UNI Push Pan Head Screw x4 15 Hose Connections 16 PEX Hose with cor...

Страница 14: ...KIT MEASUREMENTS 744 5 mm 145 9 mm 442 mm INFORMATION VALID FOR ALL SHOWER VARIANTS Picture displaying OS Head Hand Shower variant Pre installation 10 ...

Страница 15: ...level CAUTION Crucial measurement INSTALLATION SCENARIO DIS PLAYED IN MANUAL Adjust lengths and bends on pipes cables and hoses depending on scenario chosen See section Configuration Requirements in Chapter Installation Overview for require ments on maximum lengths and maximum number of pipe bends Pre installation 11 ...

Страница 16: ...level 3 CAUTION Crucial that all noggin pieces are in level and set according to rec ommended measurements to avoid misalignment in the shower installation X Finished floor height where it is level Y Wall thickness after completed instal lation 4 CAUTION Crucial that all noggin pieces are in level and set according to rec ommended measurements to avoid misalignment in the shower installation 85 mm...

Страница 17: ...ves and Drain Pipes for Control Unit Diverter and Drain Unit to the Core mounting area Use conduit elbows in kit to enable the bends See section Configuration Requirements 5 in Chapter Installation Overview 5 for requirements on maximum lengths and maximum number of pipe bends NOTICE Picture above is for illustration purposes only adjust pipe rout ing and bends to local require ments Pre installat...

Страница 18: ...inless Steel Screw Choose the 5 holes that fits the noggins best There are holes at the distance of 300 mm 600 mm and then outer cor ners and the middle 2 Next step depends on Shower variant Follow steps valid for OS Drain Step 3 3 Valid for OS Drain 30mm X X Z Z X Finished floor height where it is level Z Drain Unit is centered in the shower space 4 Connect Drain Unit to the sewerage sys tem as d...

Страница 19: ...1 NOTICE Apply lubricant CAUTION Check water tightness to elimi nate leakage 2 NOTICE Anchors provided by Customer Anchor the Drain Piping according to lo cal regulations Pre installation 15 ...

Страница 20: ...nd the Control unit are centered towards the cutouts in the Diverter wall bracket 2 Anchor the Control Unit and Diverter Piping according to local regulations 3 Next step depends on Shower variant Follow steps valid for OS Head Shower Prepare OS Head Shower 17 Follow steps valid for 3rd party Shower Pre pare 3rd Party Head Shower 17 Pre installation 16 ...

Страница 21: ... party divert ers head hand showers Applies to instal lation with Orbital Shower When using a third party diverter head shower or hand shower it is recommended to choose products with low counter pres sure in order to optimise the Orbital Show er performance Should the combined counter pressure from the diverter and head hand shower exceed 1 bar at 10 L min it will affect the lifespan of the filte...

Страница 22: ...min 100 mm max 400 mm Measure and align the placement of the Core Wall Mounting 2 x7 Pan Head Stainless Steel Screw The weight of the Shower Core is approx 30 kg The wall construction must be able to support this load 3 Pre installation 18 ...

Страница 23: ...o the same level as the bottom of the bent edge of the Drain Unit flange 3 NOTICE Make sure the surface adjacent to the Drain Unit is flush with the flange Min 2 Form a steep inclination according to lo cal regulations min 2 inclination to wards the Drain Unit 4 Clean the metal flanges of the Drain Unit Pre installation 19 ...

Страница 24: ...5 6 X X X Install waterproof membrane according to local regulations Make sure they cover the metal flanges of the Drain Unit ac cording to membrane supplier recom mendation X 7 7 Pre installation 20 ...

Страница 25: ...CAUTION Do not cut the PEX hoses They need to stick out for coming in stallation steps Min 8 mm Max 16 mm Ø 30 mm Cut holes in tiles for water connections Create a slot between the holes and fill the slot with grouting up to tile level Pre installation 21 ...

Страница 26: ...loor tiles must be level with or higher than the Frame Make sure the tiles do not overlap the Grating allowing it to be removed 3 2 mm 2 mm 4 Apply sealant according to local regula tions 5 11 Pre installation 22 ...

Страница 27: ...l conduit in kit to anchor piping for head hand show er CAUTION The Core shall be connected to the top inlet CAUTION The Shower Head shall be con nected to the bottom inlet NOTICE Wall conduits for incoming water and electricity is supplied by cus tomer 2 Anchor piping for Control Dial with a Domed conduit Pre installation 23 ...

Страница 28: ...will not function without executing above mentioned steps Pre installation completed Next step is to install the Shower Unit Show er Head and Hand Shower including Diverter and Holder See Installation manual for de tails Pre installation 24 ...

Страница 29: ...C E R T I F I E D S P A C E T E C H N O L O G Y ...

Отзывы: