2.
31mm
10mm
80mm
3.
Cut Conduit flush to tile surface. Drill 4 holes (6 mm) in
marked locations.
CAUTION
Only drill through the tile itself, no deeper.
CAUTION
Seal drill holes according to local
regulations or best practice.
1
2
3
4
1
2
•
A:
Wood / Concrete
•
B:
Waterproofing membrane
•
C:
Tile adhesive
•
D:
Tile
Page 26 of 33
Содержание OAS Standart R3
Страница 1: ...Technology Installation Orbital Shower Panel R3 5 06 0012 Publication date 2021 08 27 ...
Страница 4: ...This page is intentionally left blank Page 4 of 33 ...
Страница 14: ...3 Install Panel 3 x8 M3 5 5mm driver Install Control Dial 7 Page 14 of 33 ...
Страница 18: ...2 Adjust until edge aligned to edge Adjust until edge aligned with magnet 3 Page 18 of 33 ...
Страница 19: ...4 5 Adjust Panel depth Page 19 of 33 ...
Страница 30: ...3 Hand Shower installation completed Page 30 of 33 ...
Страница 32: ...This page is intentionally left blank Page 32 of 33 ...
Страница 33: ...C E R T I F I E D S P A C E T E C H N O L O G Y ...