4.
31mm
10mm
300mm
x2
T25 stainless steel screw 50 mm (5.5 mm)
5.
CAUTION
It’s important that the PEX Conduits are
pushed in all the way to ‘stop’ before
cutting to the correct length of 18 mm.
18 mm
6.
CAUTION
Do not run water through the Diverter
before Diverter Housing Cover is
mounted.
x2
MC6S M4 x 8H A2 hexagon screw
Page 27 of 33
Содержание OAS Standart R3
Страница 1: ...Technology Installation Orbital Shower Panel R3 5 06 0012 Publication date 2021 08 27 ...
Страница 4: ...This page is intentionally left blank Page 4 of 33 ...
Страница 14: ...3 Install Panel 3 x8 M3 5 5mm driver Install Control Dial 7 Page 14 of 33 ...
Страница 18: ...2 Adjust until edge aligned to edge Adjust until edge aligned with magnet 3 Page 18 of 33 ...
Страница 19: ...4 5 Adjust Panel depth Page 19 of 33 ...
Страница 30: ...3 Hand Shower installation completed Page 30 of 33 ...
Страница 32: ...This page is intentionally left blank Page 32 of 33 ...
Страница 33: ...C E R T I F I E D S P A C E T E C H N O L O G Y ...