System Commissioning
Run the O3b System
OceanTRx™4-500 O3b System Installation Guide
4-19
Verify that the O3bLink Control window parameters are configured as displayed in the
following window.
Figure
4-18: Partial Control Tab
–
Operation/Handover Configuration
For dual Antennas installation, the selected number of Antennas shall
be 2.
4
4
.
.
8
8
R
R
u
u
n
n
t
t
h
h
e
e
O
O
3
3
b
b
S
S
y
y
s
s
t
t
e
e
m
m
After completing the configuration procedure, run the O3b system and verify system
operation.
To run the system
Select the
Control
tab and click
Run
in the
Control
window.