background image

-

Installation 

 

 

37

-

 

3.2.2  Assembling of the front part 

 

Figure 18: 

Assembling of the

 

PI 2xx 

Содержание CoolingJacket Advanced

Страница 1: ...Operator s Manual optris CoolingJacket Advanced Cooling housing for PI series infrared video thermometer and infrared thermometer at high ambient temperatures...

Страница 2: ...Optris GmbH Ferdinand Buisson Str 14 13127 Berlin Germany Tel 49 30 500 197 0 Fax 49 30 500 197 10 E mail info optris de Internet www optris de...

Страница 3: ...tes 6 1 1 Intended use 6 1 2 Warranty 7 1 3 Scope of supply 8 1 3 1 Versions 8 1 4 Mounting accessories 9 1 4 1 Accessories for PI Netbox 9 1 4 2 Accessories for USB Server Gigabit 10 2 Technical Data...

Страница 4: ...ection window 15 2 2 3 Mounting flange 16 2 2 4 Additional accessories 16 2 3 Dimensions 17 2 4 Fittings 26 2 4 1 Cooling water fitting 26 2 4 2 Air purge collar 26 2 4 3 Cable glands on the back 28 2...

Страница 5: ...PI camera infrared video thermometer and infrared thermometer 33 3 2 1 Assembling of the focusing unit 33 3 2 2 Assembling of the front part 37 3 2 3 Assembling to the standard version 40 3 2 4 Assemb...

Страница 6: ...CTlaser and CSlaser for application at high ambient temperatures Read the manual carefully before the initial start up The producer reserves the right to change the herein described specifications in...

Страница 7: ...hich result from misuse or neglect The warranty also expires if you open the product The manufacturer is not liable for consequential damage or in case of a non intended use of the product If a failur...

Страница 8: ...Part No ACPIxxxCJAEx consisting of housing incl chassis Part No ACCJAxxxxx consisting of focusing unit or front part PI 2xx CoolingJacket Advanced for CSlaser CTlaser as well as CTvideo and CSvideo Pa...

Страница 9: ...re 1 Accessories for PI Netbox 1 Support rods for Industrial PIF 2x distance bolt SW 5 5x6 M3x6 2x cylinder head screw M3x10 and 2x cylinder head screw M3x5 2 Shaft for fixing the PI Netbox 3 Holding...

Страница 10: ...cessories for USB Server Gigabit Figure 2 Accessories for USB Server Gigabit 1 DIN rail plate for fixing the USB server Gigabit 2 Distance rings 3 Screws 4 Support rods for Industrial PIF with thread...

Страница 11: ...nsing Material housing V2A V2A Dimensions 271 mm x 166 mm x 182 mm 426 mm x 166 mm x 182 mm Weight 5 7 kg 7 8 kg Air purge collar G1 4 Internal thread G3 8 External thread G1 4 Internal thread G3 8 Ex...

Страница 12: ...cs Part No ACCJAFU23 PI 4xx PI 640 Focusing unit for 13 optics Part No ACCJAFU13 for 15 optics Part No ACCJAFU15 for 29 optics PI 4xx and 33 optics PI 640 Part No ACCJAFU38 for 53 optics PI 4xx and 60...

Страница 13: ...rt for 23 and 41 optics PI 2xx Part No ACCJAFP2XX PI 1M 05M Front part for all optics PI 1M 05M incl protection window Part No ACCJAFP1M Front part for CTlaser CSlaser CTvideo CSvideo Part No ACCJAFPC...

Страница 14: ...Ethernet cable cat 6 250 C 10 m incl 2x RJ45 connector Part No ACCJAETCB10H2 High temperature Ethernet cable cat 6 250 C 20 m incl 2x RJ45 connector Part No ACCJAETCB20H2 High temperature USB cable 1...

Страница 15: ...92 ACCJAPWZNS Protective window 50 8 x 3 mm ZnS for PI450 G7 640 G7 7 9 m 0 93 ACCJAPWZNS Protective window 50 8 x 3 mm ZnS for PI160 4xx 450 G7 640 7 5 13 m 0 91 ACCJAPWPI2XXLW Protective window 67 x...

Страница 16: ...ront mounting of the CoolingJacket Advanced Standard and Extended including mounting screws and washers 2 2 4 Additional accessories Industrial PIF without housing Part No ACCJAPIPIF500V2 500 VACRMS i...

Страница 17: ...Technical Data 17 2 3 Dimensions Standard version Figure 3 CoolingJacket Advanced standard version side view...

Страница 18: ...18 Figure 4 CoolingJacket Advanced standard version top view...

Страница 19: ...Technical Data 19 Figure 5 CoolingJacket Advanced standard version front view...

Страница 20: ...20 Figure 6 CoolingJacket Advanced standard version complete view...

Страница 21: ...Technical Data 21 Extended version Figure 7 CoolingJacket Advanced extended version side view...

Страница 22: ...22 Figure 8 CoolingJacket Advanced extended version top view...

Страница 23: ...Technical Data 23 Figure 9 CoolingJacket Advanced extended version front view...

Страница 24: ...24 Figure 10 CoolingJacket Advanced extended version complete view...

Страница 25: ...Technical Data 25 Mounting flange Accessories Figure 11 Mounting flange for CoolingJacket Advanced Standard and Extended...

Страница 26: ...pprox 45 to avoid air bubbles 2 4 2 Air purge collar Use oil free technically clean air only The needed amount of air at least 120 l min 5 8 bar depends on the application and the installation conditi...

Страница 27: ...al Data 27 The following classes according to ISO 8573 1 are recommended for the quality of compressed air Classes Oil content class 2 or better Water content class 4 or better Solid content class 2 o...

Страница 28: ...28 2 4 3 Cable glands on the back Figure 12 Cable glands with seal insert...

Страница 29: ...2 5 l min of flow Ambient temperature 255 C Cooling water input C 25 30 35 40 Camera Thermometer C 39 42 45 51 Table 2 Cooling properties with a steady flow and various cooling water input temperatur...

Страница 30: ...erature 80 C Relative humidity 25 Minimum device temperature 45 C At an ambient temperature of 80 C and a relative humidity of 25 the device temperature must not be below 45 C Otherwise condensation o...

Страница 31: ...20 25 25 25 25 30 35 0 0 5 10 10 15 15 20 20 20 25 25 25 25 30 30 30 30 35 40 0 5 10 10 15 20 20 20 25 25 25 30 30 30 35 35 35 35 40 45 0 10 15 15 20 25 25 25 30 30 35 35 35 35 40 40 40 40 45 50 5 10...

Страница 32: ...oolingJacket Advanced both in the standard version and in the extended version can be installed in the desired position via the mounting bracket Figure 13 CoolingJacket Advanced with mounting bracket...

Страница 33: ...1 Assembling of the focusing unit The focusing unit consists of two parts external 1 and internal 2 part The external part focuses the camera The internal part fixes the camera Figure 14 Focusing uni...

Страница 34: ...34 Figure 15 Assembling of the 6 9 23 26 29 33 39 41 53 72 and 80 optics...

Страница 35: ...Installation 35 Figure 16 Assembling of the 13 and 15 optics...

Страница 36: ...36 Figure 17 Assembling of the 60 and 90 optics...

Страница 37: ...Installation 37 3 2 2 Assembling of the front part Figure 18 Assembling of the PI 2xx...

Страница 38: ...38 Figure 19 Assembling of the PI 1M 05M...

Страница 39: ...Installation 39 Figure 20 Assembling of the CTlaser CSlaser CTvideo CSvideo...

Страница 40: ...ion Depending on the chassis either a camera of the PI series a laser infrared thermometer or an infrared video thermometer can be installed Figure 21 CoolingJacket Advanced standard version 1 Housing...

Страница 41: ...nt part in the chassis Figure 22 Position it as shown in Figure 23 by pushing it to the bottom The PI 1M 05M camera is first placed into the chassis without the front part After that the front part is...

Страница 42: ...42 Figure 23 Focusing unit with camera 3 Fix the camera with the provided screw on the bottom of the chassis...

Страница 43: ...chassis 4 Then connect the PI camera with the provided USB cable and lead it out of the cable gland 5 Slide the chassis with the camera in the housing Put the pins of the hinges to the slits of the ch...

Страница 44: ...44 Figure 25 Locking of the hinge 6 Move the locking lever to the left symbol so that the chassis is fitted close to the inner surface of the housing Figure 26...

Страница 45: ...contact of the cooling jaws with the camera infrared thermometer and inner housing generates an optimal cooling effect 1 Contact of the cooling jaws and inner housing 2 Contact of the cooling jaws an...

Страница 46: ...46 Figure 26 Back side of the CoolingJacket with locking lever 1 Locking lever...

Страница 47: ...Installation 47 7 Dismount in reverse order Figure 27 Unlocking of the hinge...

Страница 48: ...red thermometer 1 Screw the infrared thermometer in the thread M48x1 5 of the front part see Figure 20 and seat the front part in the chassis Figure 28 Figure 28 Front part with infrared thermometer 2...

Страница 49: ...era in the housing Put the pins of the hinges to the slits of the chassis and lock the hinge by pushing in forward Figure 25 4 Move the locking lever to the left symbol so that the chassis is fitted c...

Страница 50: ...on of the CoolingJacket Advanced provides an installation of the PI series together with the PI Netbox and an industrial PIF or with the USB server Gigabit and an industrial PIF Figure 30 CoolingJacke...

Страница 51: ...extended version Assembling of PI Netbox and industrial PIF 4 Mount the holding plate screws M3x5 Then attach the two support rods complete with the distance bolts SW 5 5x6 M3x6 with the provided scr...

Страница 52: ...2 Figure 32 a c Mounting of the accessories for PI Netbox a Holding plate for PI Netbox top view b Support rods for industrial PIF view from the bottom c Shaft to fix the PI Netbox view from the botto...

Страница 53: ...tion 53 5 Fix the industrial PIF with the screws M3x5 as shown in Figure 33 Figure 33 Mounting of the industrial PIF top view 6 To mount the PI Netbox to the chassis screw it to the fastening rail scr...

Страница 54: ...ail with the PI Netbox into the left notch 1 of the shaft Afterwards into the right notch 1 Figure 35 until it is engaged Figure 36 By locking the chassis the shaft pushes the PI Netbox to the inner s...

Страница 55: ...Installation 55 Figure 35 Notch to fix the PI Netbox top view 1 Notch...

Страница 56: ...g the PI Netbox into the chassis right hand view 7 Then connect the PI camera and the PI Netbox with the provided USB cable and the Industrial PIF with the camera Combine the network connector and the...

Страница 57: ...Installation 57 Figure 37 Chassis with PI camera industrial PIF and PI Netbox Follow as step 5 page 43...

Страница 58: ...erver Gigabit Then attach the support rods with the provided screws M3x10 to one side of the chassis use the distance ring on the left Figure 38 Figure 38 a b Mounting of the accessories for USB serve...

Страница 59: ...Installation 59 5 Fix the Industrial PIF with the screws M3x5 as shown in Figure 39 Figure 39 Mounting of the industrial PIF top view 6 Engage the USB server Gigabit to the DIN rail plate Figure 40...

Страница 60: ...igabit into the chassis top view and right hand view 7 Then connect the PI camera and the USB server Gigabit with the provided USB cable and the Industrial PIF with the camera Combine the network conn...

Страница 61: ...Installation 61 Figure 41 Chassis with PI camera industrial PIF and USB server Gigabit Follow as step 5 page 43...

Страница 62: ...allation Cooling Jacket Standard PI camera HT Ethernet cable Cat 6 Cooling Jacket Extended or PI camera USB server Gigabit PI Netbox HT USB cable PIF cable Industrial PIF 3x Analog Output 2x Analog In...

Страница 63: ...tion 63 Cooling Jacket Extended or PI Netbox PI camera USB server Gigabit Cooling Jacket Standard HT cable CTlaser PIF cable 3x Analog Output 2x Analog Input 1x Digital Input CT Box Industrial PIF HT...

Страница 64: ...64 Cooling Jacket Standard HT cable CTvideo Cooling Jacket Standard HT cable analog 4 20 mA digital CSlaser sensor signals laser CT Box HT cable video signal...

Страница 65: ...80 C 250 C IR video thermometer and IR thermometer 3 m 8 m 15 m HT Ethernet cable Cat 6 10 m und 20 m HT USB cable 5 m 10 m HT cable current loop alarm laser Cooling Jacket Standard CSvideo HT USB cab...

Страница 66: ...gure 42 CoolingJacket Standard with CSvideo Figure 43 Cooling Jacket Advanced Extended with PI Netbox and industrial PIF Figure 44 Cooling Jacket Advanced Extended Version with USB Server and industri...

Страница 67: ......

Страница 68: ...optris CJA MA E2017 08 A...

Отзывы: