26
-
2.4 Fittings
2.4.1 Cooling water fitting
The cooling water input and output has a
G1/4“-internal thread and a G3/8“-external thread.
The maximum cooling water pressure is 15 bar (271 psi).
While connecting the hoses keep inclined the Cooling Jacket at an angle of approx. 45° to
avoid air bubbles.
2.4.2 Air purge collar
Use oil-free, technically clean air only.
The needed amount of air (at least 120 l/ min., 5-8 bar) depends on the application and the
installation conditions on-site.
The air purge collar has a
G1/4“-internal thread and a G3/8“-external thread.
The lens must be kept clean at all times from dust, smoke, fumes and other contaminants in order to avoid
reading errors. These effects can be reduced by using an air purge collar.
Содержание CoolingJacket Advanced
Страница 17: ...Technical Data 17 2 3 Dimensions Standard version Figure 3 CoolingJacket Advanced standard version side view...
Страница 18: ...18 Figure 4 CoolingJacket Advanced standard version top view...
Страница 19: ...Technical Data 19 Figure 5 CoolingJacket Advanced standard version front view...
Страница 20: ...20 Figure 6 CoolingJacket Advanced standard version complete view...
Страница 21: ...Technical Data 21 Extended version Figure 7 CoolingJacket Advanced extended version side view...
Страница 22: ...22 Figure 8 CoolingJacket Advanced extended version top view...
Страница 23: ...Technical Data 23 Figure 9 CoolingJacket Advanced extended version front view...
Страница 24: ...24 Figure 10 CoolingJacket Advanced extended version complete view...
Страница 28: ...28 2 4 3 Cable glands on the back Figure 12 Cable glands with seal insert...
Страница 34: ...34 Figure 15 Assembling of the 6 9 23 26 29 33 39 41 53 72 and 80 optics...
Страница 35: ...Installation 35 Figure 16 Assembling of the 13 and 15 optics...
Страница 36: ...36 Figure 17 Assembling of the 60 and 90 optics...
Страница 37: ...Installation 37 3 2 2 Assembling of the front part Figure 18 Assembling of the PI 2xx...
Страница 38: ...38 Figure 19 Assembling of the PI 1M 05M...
Страница 39: ...Installation 39 Figure 20 Assembling of the CTlaser CSlaser CTvideo CSvideo...
Страница 42: ...42 Figure 23 Focusing unit with camera 3 Fix the camera with the provided screw on the bottom of the chassis...
Страница 46: ...46 Figure 26 Back side of the CoolingJacket with locking lever 1 Locking lever...
Страница 47: ...Installation 47 7 Dismount in reverse order Figure 27 Unlocking of the hinge...
Страница 55: ...Installation 55 Figure 35 Notch to fix the PI Netbox top view 1 Notch...
Страница 57: ...Installation 57 Figure 37 Chassis with PI camera industrial PIF and PI Netbox Follow as step 5 page 43...
Страница 61: ...Installation 61 Figure 41 Chassis with PI camera industrial PIF and USB server Gigabit Follow as step 5 page 43...
Страница 67: ......
Страница 68: ...optris CJA MA E2017 08 A...