-
40
-
3.3 Electrical Installation
The delivered glass system is already
pre-wired and is ready for operation
without
any
additional
electrical
installation.
To integrate the input signal from the
furnace with the glass inspection
system, you must open the control
cabinet. On the left side is a terminal
block, which is connected to different
colors of wires. These are labeled as
follows (
).
Figure 22:
Control cabinet open
Содержание Bottom-Up GIS 450i G7
Страница 1: ...Operators Manual Bottom Up GIS 640i G7 and 450i G7 Glass Inspection System ...
Страница 11: ... Technical Data 11 Figure 1 Dimensions mm shutter system ...
Страница 12: ... 12 Figure 2 Dimensions mm control cabinet ...
Страница 13: ... Technical Data 13 Figure 3 Dimensions mm CTL 4M ...
Страница 20: ... 20 CTL 4M FF optics Figure 5 spot size diagram ...
Страница 27: ... Installation 27 Figure 10 camera distance ...
Страница 44: ... 44 Figure 27 Linescan in PIX Connect software customized Layout ...
Страница 52: ... 52 Appendix A Control cabinet Figure 34 Wiring diagram of control cabinet ...
Страница 57: ...Bottom Up GIS MA E2022 04 A ...