OptiPure BWS350 Скачать руководство пользователя страница 16

BWS350 System Installation, Operation & Maintenance 

16

Normally, the most frequent routine maintenance 

required on the system is periodic replacement of 

the carbon/sediment pre-filters and the optional post-

treatment cartridge. The CTO-Q cartridges should 

be changed every 3-6 months depending on water 

usage.  In areas with high levels of sediment and other 

contaminants the CTO-Q cartridges may require more 

frequent changes.   

Pre-Filter change procedure

1.  Unplug the RP Pump power cord.
2.  Either close the Water Supply Valve (shutting off 

all water flow), or put the Emergency Bypass Valve 

(on the Processor) in the System Bypass position 

(allowing untreated water to continue to flow to the 

equipment). 

3.  Wait a moment for system pressure to drain off.
4.  Once the system pressure has been relieved, 

remove the two CTO-Q cartridges by turning a 

quarter-turn to the left and pulling down on the 

cartridge.  

5.  Install the new CTO-Q cartridges into the QT 

heads by aligning the notches and pushing up, 

then turn a quarter-turn to the right.

6.  Install a piece of 3/8” tubing in the Processor 

Sample Port valve, open the Sample Port, and 

direct to a bucket or drain.

7.  Turn the Tank Inlet Divert Valve to the Bypass 

Mode (Handle Pointing UP).  

8.  Open the Water Supply Valve and put the 

Emergency Bypass Valve in the “SERVICE” 

position, allowing water to run into the new Pre-

Filter cartridges and purge air through the system 

and out the Sample/Flush Port to drain.   

9.  Once the air has been purged and filters flushed, 

close the Sample Port valve and return the Tank 

Inlet Divert Valve to the Normal position (handle 

horizontal or down).  

10. Check for leaks.
11.  Plug in the RP Pump power cord.

Optional Post-treatment cartridge change 

procedure 

(if applicable)

1.  Close the ball valve at the inlet to the Post-

Treatment assembly.  

2.   Remove the existing cartridge and discard.
3.  Install the new cartridge.
4.  Open the ball valve and the RP pump should 

actuate filling the housing with water.  

AMS-QT Replacement

The AMS-QT membrane is a high-efficiency, low-

fouling reverse osmosis membrane that will provide 

product water with >97% rejection of the Feed Water.  

The life of the membrane will vary depending on Feed 

Water quality, usage, and Pre-Filter maintenance.  

Typical membrane life is 12 to 18 months, but with rou-

tine scheduled Pre-Filter replacement, and no adverse 

Feed Water conditions, the AMS-QT membrane may 

last 2-5 years.  
1.  Unplug the RP Pump power cord.
2.  Either close the Water Supply Valve (shutting off 

all water flow), or put the Emergency Bypass Valve 

(on the Processor) in the System Bypass position 

(allowing untreated water to continue to flow to the 

equipment).  

3.  Place a bucket or other similar catch basin under 

the AMS-QT.  Remove the black reject line from 

the push-to-connect elbow on the bottom of the 

membrane.  (Refer to “Push-to-Connect Fittings” 

on page 20.) Allow the membrane and reject line 

to drain into the bucket.

4.  Remove the AMS-QT cartridge from the head by 

turning the cartridge a quarter-turn to the left and 

pulling down on the cartridge.  

5.  With a wrench, remove the push-to-connect elbow 

and stem adapter attached to the bottom of the 

AMS-QT cartridge.  Remove the residual Tef-

 Routine Maintenance

CTO-Q Pre-Filters

PN: 300-05830

Change Every 3 to 6 months

Emergency  Bypass V

alve

Sample Port

-

For T

esting, 

Priming and  Sampling ONL

Y.

AMS-QT Cartridge -

PN: 204-53040

MA-QT15 PN:300-05855

Change Every  6 months

Содержание BWS350

Страница 1: ...m Installation Operation Maintenance Manual Rev 4 Manufactured By OptiPure a Div of AQUION Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS350 iom manual_v3 indd 201...

Страница 2: ...Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box Only a...

Страница 3: ...Equipment Sample Port 3 8 Push to Connect Used to flush pre filters gather a water sample measure pro duction or drain water from storage tank Blending Valve Allows precise adjustment of optimized wat...

Страница 4: ...minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drain line The drain connection should be accessible for system set u...

Страница 5: ...ASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS THE 16 GAL TANK 140 LBS ALWAYS LOCATE THE STORAGE TANK WHERE IT CAN BE ACCESSED DURING SERVICE Allow 3 t...

Страница 6: ...1 3 2 Processor Tank Repressurization Return Optimized Water to Storage Tank Sample Port Power Cord When installing keep lines from the Repres surization Assembly to the equipment as short as possibl...

Страница 7: ...m FEED WATER INLET with the green tubing supplied Hose tubing and fittings for making connections between the processor storage tank and drain are supplied in the installation kit 1 Remove the tank li...

Страница 8: ...MIZED WATER TO EQUIPMENT Connect a piece of 1 2 ID gray hose to the OPTIMIZED WATER OUTLET on the processor with a 1 2 hose barb insert and clamp supplied At a later time the other end of this line wi...

Страница 9: ...w Lower the float allowing the ball to drop back down The water should begin flowing again 3 The 16 Gal Storage Tank must be filled or the 50 Gal Storage Tank filled approximately 1 3 of the way to st...

Страница 10: ...al changes in water quality and municipal source blending practices To assure maintaining your target TDS range year round we recommend periodically checking the IN TDS and making adjustments as neede...

Страница 11: ...ly allow the pump to run to open drain with valve fully open to purge air from the pump head Disconnect the power and reconnect several times to facilitate air purging The pump will prime only if all...

Страница 12: ...ass Valve PN 520 12230 Solenoid Valve PN 714 10005 Pressure Gauge PN 530 20018 Reject Flow Control PN 514 00440 Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check...

Страница 13: ...520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Processor When tank is full float switch is in up positon and switch inside float is open causing Processo...

Страница 14: ...quality TDS level Turbidity and specific contaminants such as iron and silica along with water temperature and water pressure The determination of whether to make a Product Reject Flow Rate adjustmen...

Страница 15: ...ple Port in 60 seconds To convert ounces per minute to gallons per day multiply ounces mn by 11 25 When finished close the Sample Port valve turn the Tank Inlet Divert Valve to the Down position and o...

Страница 16: ...zontal or down 10 Check for leaks 11 Plug in the RP Pump power cord Optional Post treatment cartridge change procedure if applicable 1 Close the ball valve at the inlet to the Post Treatment assembly...

Страница 17: ...hes under a preventive maintenance schedule such as annually To restore a Pump with worn brushes order and install Brush Kit 704 39905 which is supplied with instructions Buffer Tank Pre Charge Pressu...

Страница 18: ...Relay Allow Processor to partially fill Tank with water Green LED indicates RP Pump is operational will turn on when Buffer Tank is empty Try bumping the RP Pump with your hand If it turns on tempora...

Страница 19: ...felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make s...

Отзывы: