OptiPure BWS350 Скачать руководство пользователя страница 14

BWS350 System Installation, Operation & Maintenance 

14

Introduction

The AMS-QT Reverse Osmosis membrane uses 

pressure to allow pure water molecules to filter through 

its semipermeable membrane separating pure water 

from dissolved solids (salts) and other contaminants. 

In essence the membrane splits feed water into two 

separate streams. One stream is the water produced 

for use (product or pure water), and the other 

contains the salts and contaminants filtered out by 

the membrane (reject) carried away to the drain. The 

OptiPure BWS350 is designed to produce water at 

a 30% recovery rate which means it uses water at a 

ratio two gallons of reject water for each gallon of pure 

water produced. This is a 

Product/Reject Ratio of 

1:2

.

The “pure water” produced by the membrane is 

not always appropriate for use with food service 

equipment. The BWS350 system also allows 

blending filtered water with the pure water to produce 

Optimized Water

 which can be adjusted to provide 

the ideal characteristics for foodservice equipment 

applications. Instructions for blending Optimized water 

are on page 10. 

Each system is adjusted at the factory for the 

proper operating parameters. 

In most cases the factory setting should not be 

changed. However, due to certain conditions an 

adjustment may produce better operating efficiency 

and membrane performance. Conditions that can 

influence the best Product/Reject Flow Rate Ratio 

include feed water quality (TDS level, Turbidity and 

specific contaminants such as iron and silica) along 

with water temperature and water pressure. The 

determination of whether to make a Product/Reject 

Flow Rate adjustment is complex. An understanding 

of your water chemistry and operating conditions in 

necessary in order to safely deviate from the factory 

setting. 

It is strongly recommended that you 

contact your OptiPure dealer or the factory for 

assistance before changing the factory setting. 

Reject Flow Rate Adjustment

The parameter that can be adjusted is the 

Reject 

Flow Rate

. This is the amount of water used to carry 

away the impurities rejected by the membrane. It 

is critical that both the Product Flow Rate and the 

Reject Flow Rate are measured to confirm the desired 

Product/Reject Ration has been achieved. The higher 

the ratio of product to reject flow rate, the shorter the 

life of the membrane will be. 

IMPORTANT: Never close the Reject Flow Control 

Valve, and never adjust it such that the Reject flow 

rate is less than the Permeate (Product) flow rate! 

This will cause premature fouling and shorten 

membrane life.

To adjust the reject flow rate, locate the reject flow 

control valve. Loosen the lock-nut (at the base of the 

valve stem) just slightly. 

IMPORTANT:  Before adjusting Reject Flow Rate 

CLOSE

 the BLENDING VALVE.  

To increase the reject flow rate, use a slot screw driver 

to turn the valve stem counterclockwise. To reduce the 

reject flow rate, turn it clockwise. A minor adjustment 

makes a big difference in the flow rate so begin with

 Product/Reject Flow Rate Adjustments

Reject Flow Control

Adjust with Blend Valve Closed

Содержание BWS350

Страница 1: ...m Installation Operation Maintenance Manual Rev 4 Manufactured By OptiPure a Div of AQUION Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS350 iom manual_v3 indd 201...

Страница 2: ...Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box Only a...

Страница 3: ...Equipment Sample Port 3 8 Push to Connect Used to flush pre filters gather a water sample measure pro duction or drain water from storage tank Blending Valve Allows precise adjustment of optimized wat...

Страница 4: ...minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drain line The drain connection should be accessible for system set u...

Страница 5: ...ASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS THE 16 GAL TANK 140 LBS ALWAYS LOCATE THE STORAGE TANK WHERE IT CAN BE ACCESSED DURING SERVICE Allow 3 t...

Страница 6: ...1 3 2 Processor Tank Repressurization Return Optimized Water to Storage Tank Sample Port Power Cord When installing keep lines from the Repres surization Assembly to the equipment as short as possibl...

Страница 7: ...m FEED WATER INLET with the green tubing supplied Hose tubing and fittings for making connections between the processor storage tank and drain are supplied in the installation kit 1 Remove the tank li...

Страница 8: ...MIZED WATER TO EQUIPMENT Connect a piece of 1 2 ID gray hose to the OPTIMIZED WATER OUTLET on the processor with a 1 2 hose barb insert and clamp supplied At a later time the other end of this line wi...

Страница 9: ...w Lower the float allowing the ball to drop back down The water should begin flowing again 3 The 16 Gal Storage Tank must be filled or the 50 Gal Storage Tank filled approximately 1 3 of the way to st...

Страница 10: ...al changes in water quality and municipal source blending practices To assure maintaining your target TDS range year round we recommend periodically checking the IN TDS and making adjustments as neede...

Страница 11: ...ly allow the pump to run to open drain with valve fully open to purge air from the pump head Disconnect the power and reconnect several times to facilitate air purging The pump will prime only if all...

Страница 12: ...ass Valve PN 520 12230 Solenoid Valve PN 714 10005 Pressure Gauge PN 530 20018 Reject Flow Control PN 514 00440 Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check...

Страница 13: ...520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Processor When tank is full float switch is in up positon and switch inside float is open causing Processo...

Страница 14: ...quality TDS level Turbidity and specific contaminants such as iron and silica along with water temperature and water pressure The determination of whether to make a Product Reject Flow Rate adjustmen...

Страница 15: ...ple Port in 60 seconds To convert ounces per minute to gallons per day multiply ounces mn by 11 25 When finished close the Sample Port valve turn the Tank Inlet Divert Valve to the Down position and o...

Страница 16: ...zontal or down 10 Check for leaks 11 Plug in the RP Pump power cord Optional Post treatment cartridge change procedure if applicable 1 Close the ball valve at the inlet to the Post Treatment assembly...

Страница 17: ...hes under a preventive maintenance schedule such as annually To restore a Pump with worn brushes order and install Brush Kit 704 39905 which is supplied with instructions Buffer Tank Pre Charge Pressu...

Страница 18: ...Relay Allow Processor to partially fill Tank with water Green LED indicates RP Pump is operational will turn on when Buffer Tank is empty Try bumping the RP Pump with your hand If it turns on tempora...

Страница 19: ...felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make s...

Отзывы: