![OptiPure 164-01502 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/optipure/164-01502/164-01502_simple-install-manual_1643725004.webp)
OPS70CR Simple Install Guide
4
v
OPS70CR Installation Diagram
Plumbing should be performed in
accordance with local codes.
Feedwater Line -
Green 3/8” - from Feedwater
Valve to Feedwater Inlet
Feedwater
Bypass
Valve
Drain Line
- Black 1/4” - from
Permeate Pump to Drain
Reject Water
(To Drain)
User-Supplied
Feedwater
Valve
Optimized
Water Outlet
AMS-Q10 Membrane
Cartridge
To Tank
Connection
When installing, locate the storage
tank as near the equipment as
possible to maximize water pressure
and flow. Cut tubing to an efficient
length using a tubing cutter or sharp
blade. Do not cut with wire crimpers
or dikes. When routing and securing
tubing avoid loops or kinks.
Membrane Reject
connection
Optimized Water Line to Tank
- Blue 3/8” - from Processor “To
Tank” Connection to Tank Inlet
Storage
Tank Inlet
(On Valve)
Optimized Water Storage Tank
- 2.5 gals. Bladder Tank Shown
Storage Tank
Valve
(Normally Open)
CTO-Q10 Pre-Filter Cartridge
Feedwater Inlet
Water Processor
Optimized Water
to Equipment
IMPORTANT - PROTECT PROCESSOR AND
TANK FROM THE ELEMENTS. DO NOT INSTALL
IN DIRECT SUNLIGHT OR WHERE EXPOSED TO
FREEZING TEMPERATURES OR RAIN.
CTO-Q10CR
Cartridge