OptiPure 164-01502 Скачать руководство пользователя страница 12

OPS70CR Simple Install Guide 

12 

Open

Closed

v

 

Operation

The system operates normally when water, 

under pressure, is supplied to the system. Typical 

filter replacement is every 6 months (CTOS-Q10, 

CTOS-Q10CR, and ILMA-10.14). Typical 

membrane replacement is every 24 months 

(AMS-QT10) or less, based on water quality. 

EMERGENCY BYPASS

In the event the water supply or pressure to 

downstream equipment becomes inadequate 

OPEN the Built-In Bypass Valve and resume 

normal use of equipment. When finished using 

equipment return the Valve to the CLOSED 

position. DO NOT leave the system in bypass 

mode for prolonged periods of time. 

IMPORTANT: Leaving the system in bypass 

could cause damage to downstream 

equipment. If the problem persists contact 

your OptiPure dealer for assistance. 

Step 1

Close Feed Water Supply Valve.

OR

Be sure Bypass Valve is closed and turn 

pre-filter cartridge 1/4 turn to the left .

Step 2

Close the Storage Tank Valve.

Tank Valve  in 
CLOSED position

v

 

SHUT OFF WATER TO SYSTEM

The water is now shut off 

and the system is 

ready for filter or membrane replacement or 

other maintenance.

To return to normal operation reverse these 

steps.

Содержание 164-01502

Страница 1: ...Guide Rev 1 1 OPS70_Simple_Install_v1 1 indd 2018 Procam Controls Inc All Rights Reserved Access manuals spec sheets and additional educational materials for foodservice water treatment at our website...

Страница 2: ...lowing conditions 1 Altitude up to 2000 m 2 Ambient Temperature of 40 105 F 5 40 C 3 Maximum Relative Humidity 80 at 88 F 31 C 4 Installation Category II 5 Pollution Degree II 6 Indoor use only protec...

Страница 3: ...A drain should be located within 10 feet of the system Drain must allow a minimum flow of 2 gals min Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Страница 4: ...ater pressure and flow Cut tubing to an efficient length using a tubing cutter or sharp blade Do not cut with wire crimpers or dikes When routing and securing tubing avoid loops or kinks Membrane Reje...

Страница 5: ...k and Bypass Assembly 3 8 red as shown below Step 1 Attach the system with 2 screws user supplied through the attachment keyholes shown below Use anchors or attach directly to studs Be sure to allow a...

Страница 6: ...the lower left part of the Permeate Pump Attention Warranty will be void if this step is not performed properly Step 3 Insert and lock the CTO Q10 Pre Filter and CTO Q10CR Cartridge into the filter he...

Страница 7: ...Gap available part number 164 89905 Step 5a Install the Feedwater Adapter from the installation kit into the user supplied 1 2 Feedwater Supply Valve Do not over tighten Step 5b Connect a piece of 3 8...

Страница 8: ...The remaining connection at the Tank Tee is the Optimized Water Outlet Insert the barbed end of the connector fitting into the 1 2 gray hose and secure with clamp Insert into the Tank Tee as shown Thi...

Страница 9: ...nsure Tank Valve is CLOSED Step 10 Open the Feed Valve Allow water to flow to drain until all air is purged from the system Close the Feed Valve after flushing Note During normal operation the water f...

Страница 10: ...ment If used insert the barbed end of the 3 4 GHT connector supplied into the 1 2 gray hose and secure clamp Connect ONLY to the treated steam water connection at the equipment Do not connect to the d...

Страница 11: ...er supply to downstream equipment is immediately needed the storage tank can be quickly filled Step 13 Simply OPEN the Bypass Valve and un filtered water will flow directly into the storage tank When...

Страница 12: ...ipment When finished using equipment return the Valve to the CLOSED position DO NOT leave the system in bypass mode for prolonged periods of time IMPORTANT Leaving the system in bypass could cause dam...

Отзывы: