Assembly
Version 1.0.1 dated 2016-04-25
Page 15
Original operating instructions
DX13V | DX15V
GB
Img.3-1: Example DX13V | DX15V with Machine Base 335 3000
3.4
Installation site requirements
Organize the work area around the drill according to local safety regulations. The work area for
operation, maintenance and repair must not be restrictive.
INFORMATION
In order to attain good functionality and a high processing accuracy as well as a long service life
of the machine, the place of installation should fulfil certain criteria.