OPTIMUM
M A S C H I N E N - G E R M A N Y
Installation
Version 1.0 dated 2015-03-31
Page 8
Original operating instructions
DPA22
GB
2.4
Power supply speed sensor
Power is supplied via the rear jack plug . Connect the sensor for speed measurement from the
scope of delivery with the electronic display.
2.5
Signal selection for input signal
Up: Sine 11uApp
Down TTL differential signal
Speed sensor connection
Jumper for reader signal selection