Version 1.0.4 - 2020-07-28
24
Translation of original instruction
MH22V
│
MH22VD
EN
MH
22
V_MH2
2
VD_G
B_3.
fm
foundation must be level. Check that the milling machine foundation is horizontal by
using a spirit level.
Fix the milling machine to its foundation at the recesses provided on the machine base for
this purpose.
3.6
Fastening to the Machine Base
3.6.1
Dimensions, recesses for fastening the machine
3.7
First commissioning
WARNING!
First commissioning may only take place after proper installation.
First commissioned of the milling machine by inexperienced personnel or inexperienced
users constitute a risk to personnel and equipment. We do not accept any liability for
damages caused by incorrectly performed commissioning.
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
A-A
A
A
22
0
60
250
274
34
0
220
238
Содержание 3338135
Страница 1: ...Operating Manual Version 1 0 4 Milling machine Part no 3338135 Part no 3338136 MH22V...
Страница 53: ...Version 1 0 4 2020 7 28 53 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm 6 13 Schaltplan Wiring diagram...
Страница 54: ...Version 1 0 4 2020 7 28 54 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm...
Страница 55: ...Version 1 0 4 2020 7 28 55 Originalbetriebsanleitung MH22V DE EN MH22V_parts fm...
Страница 68: ...Version 1 0 4 2020 07 28 68 Translation of original instruction MH22V MH22VD EN MH22V_MH22VD_GB_8 fm...