
Version 1.0 - 2020-09-04
17
Translation of original instructions
DX17E
EN
D
X
17E
_GB_
3.
fm
Please observe the following points:
The machine must only be installed and operated in a dry and well-ventilated place.
Avoid places near machines generating chips or dust.
The installation site must be free from vibrations also at a distance of presses, planing
machines, etc.
The substructure must be suitable for the drilling machine. Ensure that the floor has suffi-
cient load bearing capacity and is level.
The ground must be prepared in a way that potential coolants cannot penetrate the floor.
Any parts sticking out such as stops, handles, etc. have to be secured by measures taken
by the customer if necessary in order to avoid endangering persons.
Provide sufficient space for the personnel preparing and operating the machine and trans-
porting the material.
Also make sure the machine is accessible for setting and maintenance works.
3.6
Cleaning of the machine
CAUTION!
Do not use compressed air to clean the machine.
Your new drill must be completely cleaned after it is unpacked to ensure that all moving parts
and sliding surfaces are not damaged when the machine is operated. Each unit leaves the fac-
tory with all exposed parts and sliding surfaces suitably greased to avoid oxidation during the
time that elapses before it is placed into operation. Wipe all metallic surfaces with a clean cot-
ton cloth. Clean the plastic parts with cleaning agents suitable for plastic.
3.7
First commissioning
WARNING!
First commissioning may only take place after proper installation.
There is a danger to persons and equipment, if the first commissioning of the drilling
machine is carried out by inexperienced personnel. We do not accept any liability for
damages caused by incorrectly performed commissioning.
3.8
Warming up the machine
ATTENTION!
If the drilling machine and in particular the drilling spindle is immediately operated at
maximum load when it is cold it may result in damages.
INFORMATION
To ensure a long service life of your drilling machine, we recommend that you do not exceed a
maximum rotation speed of 500 rpm
during the first hour of operation. If the machine is cold,
e.g. directly after having transported the machine, it should be warmed up at a spindle speed of
only 500 1/min for the first 30 minutes.
Содержание 3020168
Страница 1: ...EN Operating Manual Version 1 0 Bench drill Part no 3020168...
Страница 26: ...Ersatzteile Spare parts 26 DE EN drilling parts preface_DE GB fm...
Страница 38: ......