Weir-Jones Engineering Consultants Ltd.
4
30144-REP-001-0.wp9
As the vibration shaker was designed to translate in the vertical direction only, a set of
Aluminum mounting fixtures were used to position the CCTV camera in its two mutually
perpendicular axes (Vertical and Transverse) as shown in Figures 4A and 4B.
Feedback accelerometers
Figure 4A:
Vertical orientation mounting of the CCTV camera.
Figure 4B:
Transverse orientation mounting of the CCTV camera.
Содержание CC-02-4.3
Страница 10: ...Weir Jones Engineering Consultants Ltd 7 30144 REP 001 0 wp9 APPENDIX 1 Calibration Certificates...
Страница 11: ...Weir Jones Engineering Consultants Ltd 8 30144 REP 001 0 wp9...
Страница 12: ...Weir Jones Engineering Consultants Ltd 9 30144 REP 001 0 wp9...
Страница 13: ...Weir Jones Engineering Consultants Ltd 10 30144 REP 001 0 wp9...
Страница 14: ...Weir Jones Engineering Consultants Ltd 11 30144 REP 001 0 wp9...
Страница 15: ...Weir Jones Engineering Consultants Ltd 12 30144 REP 001 0 wp9 APPENDIX 2 Sinusoidal Test Results...
Страница 17: ...Weir Jones Engineering Consultants Ltd 14 30144 REP 001 0 wp9 APPENDIX 3 Random Test Results...