![OPTICOM CC-02-4.3 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/opticom/cc-02-4-3/cc-02-4-3_manual_1641850002.webp)
Weir-Jones Engineering Consultants Ltd.
30144-REP-001-0.wp9
AUTHORIZATION
The work described in this report was authorized by David Boyd of Opticom Technologies
Inc. on June10 , 2005. The report was prepared by Paul Chong, P.Eng.
th
Paul Chong, P.Eng.
Project Engineer
Dated at Vancouver, June 17 , 2005.
th
Содержание CC-02-4.3
Страница 10: ...Weir Jones Engineering Consultants Ltd 7 30144 REP 001 0 wp9 APPENDIX 1 Calibration Certificates...
Страница 11: ...Weir Jones Engineering Consultants Ltd 8 30144 REP 001 0 wp9...
Страница 12: ...Weir Jones Engineering Consultants Ltd 9 30144 REP 001 0 wp9...
Страница 13: ...Weir Jones Engineering Consultants Ltd 10 30144 REP 001 0 wp9...
Страница 14: ...Weir Jones Engineering Consultants Ltd 11 30144 REP 001 0 wp9...
Страница 15: ...Weir Jones Engineering Consultants Ltd 12 30144 REP 001 0 wp9 APPENDIX 2 Sinusoidal Test Results...
Страница 17: ...Weir Jones Engineering Consultants Ltd 14 30144 REP 001 0 wp9 APPENDIX 3 Random Test Results...