<page nr>
EN
Only qualified stuff can do servicing and maintenance. All electrical
and other parts have to be in accordance with national and local
regulations (for replacement use only original parts). Do not ever
use unit which is damaged.
!
Danger
Socket need to be minimum 15A, standard with 3 (socket) 5-15P. Socket need to be
4 feet's away from the unit.
POWER
INSTALATION STEPS
1. Connect one of the glycol tubes to the pump inlet. Insulate any exposed tubing.
2. Connect the second glycol line to the pump outlet. Insulate any exposed tubing.
3. Remove filling hatch to fill the bath with liquid.
4. Inspect the bath for debris.
5. Fill the glycol bath with Micro Matic Polar Flo glycol solution (mixed 2 ½ parts
water to 1 part glycol) Fill the bath to the full level on the glycol level indicator.
6. Connect unit to the electrical outlets capable of handling the required voltage
loads. This should be carried out by suitably trained personnel and comply with all
state and national electrical codes.
7. Glycol level will fall as glycol is pumped through the glycol lines. Continue to fill
the bath to the fill level on the glycol level indicator..
8. Inspect for any leaks.
9. Glycol temperature will fall slowly to 29°F.
Instalation
7
Содержание MMPP4300-35
Страница 11: ...page nr EN Part list 11 Explode view on page 22...
Страница 22: ...Explode view Vue en clat 22...
Страница 24: ......