The fan is switched off by the sub-limit 
thermostat. The boiler temperature has 
decreased under 50

o

C.  

Set another temperature level for 
switching the fan off – see the service 
settings.  
In the event of a failure of the 
thermostat or the switch, the 
replacement must be carried out  
by a professional service company

The fan is switched off by the limit switch 
of the chimney dumper. 

The stroke of the limit switch must 
adjusted or the faulty limit switch must be 
replaced – must be carried out by a 
professional servicing company!
  

The fan is switched off by the safety 
thermostat.  
The boiler is overheated – the boiler 
temperature exceeds 95

o

C.  

The heating system must be cooled down 
to under approx. 75

o

C. The fan will then 

go automatically back on. 
Unless the fan goes back on despite the 
boiler temperature decreasing under 65°, 
the safety thermostat has failed-must be 
replaced by a professional servicing 
company!
 

 
 
 

9     Controller configuration 

 

Basic 

 

The controller maintains the boiler output temperature in keeping with the user defined fixed temperature value. 

Equithermal 

 

The controller must be equipped with an outdoor temperature sensor. The controller will calculate the required boiler output water 
temperature  based  on  an  equithermal  curve  and  the  outdoor  temperature.  The  equithermal  curve  must  be  set  experimentally  
for each type of the site to be heated up. Given its appropriate setting, the site will be heated up optimally despite any fluctuations 
in 

the 

temperatures 

outside. 

The 

user 

selects 

the 

heel 

point 

(ideally 

at 

temperatures 

of 

0°C),  

with the temperature outside going below zero (approx. -10 to -5°C), the slope must be set.  

Controlled steering 

 

Allows steering by a superior system using a 0-10V signal. This 
principally involves equithermal control where the outside temperature is 
simulated using the given external signal. 0V= +20°C, 10V= -20°C. 
 
 
 
 
 
 
 
 
 
 
 
 
 

9.1  Commissioning 
 

Having  reviewed  all  electric  parts,  check  the  heating  circuit  with  an  emphasis  on  the  proper  setting  of  the  valves.  Make  sure  
the heating circuit contains an expansion vessel and there is water in the heating circuit at the appropriate pressure value. Check 

Содержание ECOMAX 25kW

Страница 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Страница 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Страница 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Страница 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Страница 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Страница 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Страница 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Страница 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Страница 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Страница 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Страница 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Страница 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Страница 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Страница 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Страница 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Страница 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Страница 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Страница 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Страница 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Страница 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Страница 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...

Отзывы: