8.2  Operating modes 

 

We  recommend  setting  the  boiler  water  (primary  circuit)  to  the  temperature  of  at  least  70

o

C.  The  low  operating  boiler 

temperature supports condensation of tar components on the boiler walls, thus bringing out corrosion which substantially reduces 
the boiler life. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fan  blocking  –  in  order  to  make  the  firing  up  of  an  extinguished  boiler  more  comfortable,  the  flue  gas  extraction  fan 
operation may be interrupted thus avoiding having the match blown out by the undesired draught of the flue gas fan. 
Once the boiler door is opened, the flue gas fan is always switched to full power so that no flue gas leakage into the 
boiler room occurs. 
 
Manual  operation  –  switches  the  fan  and  circulation  pump  regardless  of  the  operating mode  of  the  boiler  and  output 
water boiler temperature. 
 
Setting  the  required  temperature  –  for  basic  design  only;  the  controlled  ensures  supplies  of  heating  water  
into the system according to the user-set temperature. 
  
Selection  of  equithermal  curve  –  for  equithermal  design  with  an  outdoor  temperature  sensor  only.  The  user  defined 
parameters of slope and heel point determine the nature of the equithermal curve, according to which the output water 
boiler temperature is calculated. 
 

Pressing the OK button in the basic menu displays the history of the controller’s operational values. The buttons may be used to 
change the resolution of the chart and the + - buttons are used to move across the time axis. The chart memory is roughly for 4 
hours. 

 

 
8.3  Adding fuel material 

 

Additions of the fuel material take place via a stoke door after opening the filling door. Handle the door with the chimney dumper 
open only. Given a proper function of the boiler, these conditions are met automatically once the following steps are taken: 
Open the chimney dumper with a draw bar. Wait for approx. 1 minute before slowly opening the filling door. 
Tilt down the screen with a fire hook and assess the remaining lumps of firewood. Put more wood on the hot ashes. 
Close the screen. Close the filling door and retighten the screw cap with caution. 
Use the draw bar to close the chimney dumper. The boiler will gradually ramp up to the required power. 
 
The boiler combustion time with the full chute depends on the humidity of the fuel material and the power consumed. 

 

Warning: 
After the stoking, the chimney dumper must be closed! An open chimney dumper will allow uncontrolled burning of the boiler due 
to continuous intake of secondary air. Boiler overheating is imminent! 
 

Fan power  

Operating mode  
of the controller 
 
Stoking 
Running 
Lack of fuel material 
Manual operation 

Setting the required 
temperature for the basic 
design 

Selectin of an 
equithermal curve for 
equithermal design with 
an outdoor sensor 

Confirmation buttons 

Change in value + - 

Manual mode,  
the fan and 
circulation pump 
switched on 

Fan blocking  

Boiler output water temperature 

Outdoor 
temperature 

Pump operation  

Содержание ECOMAX 25kW

Страница 1: ...Page 1 HOT WATER WOOD BOILER ECOMAX 25 35 42kW USER MANUAL 2012 Manufacturer...

Страница 2: ...ection to the hot water system 7 7 3 Boiler connection to the smoke duct and chimney 9 7 4 Boiler connection to the power grid 9 8 Operating and maintaining the boiler 10 8 1 General principles 10 8 2...

Страница 3: ...ee B C1 and C2 combustibility materials for the degrees of combustibility see the Table The safe distance of 200 mm must be doubled for any boiler and smoke flues located in the vicinity of C3 degree...

Страница 4: ...idential spaces including corridors Warning In circumstances resulting in the risk of temporary ingress of combustible gases or vapours and while performing works that might imply a temporary risk of...

Страница 5: ...or 3 Chute 12 4 Combustion chamber 5 Chimney dumper 14 15 6 Door screen 7 Hot water branch 8 Cold water branch 9 Door closing 10 Control unit 11 Main switch 12 Safety valve branches 13 Cleaning cap 14...

Страница 6: ...wood quality is specified It is recommended to burn lump wood cut in maximum lengths as per the table of technical parameters The wood must be combusted as dry as possible with at least 15 humidity ma...

Страница 7: ...stem A gasket must be inserted between the flanges and bolted together using M8x25 bolts A TS 130 safety discharge valve shall be fitted The fixture must be bolted to one of the lateral 3 4 outlets an...

Страница 8: ...st be fitted to the hot water outlet from the boiler as close to the outlet pipe as possible Chart showing connection of the boiler to a forced circulation system indicative chart with no claim to com...

Страница 9: ...et connection must conform to the applicable SN standards An unprofessional intervention in the electric wiring of the boiler will result in the latter becoming damaged and may lead to fatal injuries...

Страница 10: ...e used to change the resolution of the chart and the buttons are used to move across the time axis The chart memory is roughly for 4 hours 8 3 Adding fuel material Additions of the fuel material take...

Страница 11: ...ing process in keeping with the required parameters In all modes basic equithermal controlled fan power is controlled based on the required boiler water output temperature As a default we recommend op...

Страница 12: ...difficult to control and the standby time in hot reserve is reduced The problem may be solved by installing a draught controller between the boiler and the chimney The draught controller may be order...

Страница 13: ...ush supplied as part of the boiler accessories Use a scraper to clean the entire flue duct including the chimney flap Check the tightness of the chimney flap Where necessary adjust the flap position i...

Страница 14: ...the fan by the manual switch and wait for the chimney to cool down entirely about 1 hour If the boiler temperature keeps rising and you can still heat the flap flapping a draught controller needs to b...

Страница 15: ...r maintains the boiler output temperature in keeping with the user defined fixed temperature value Equithermal The controller must be equipped with an outdoor temperature sensor The controller will ca...

Страница 16: ...oller where the former must be fitted with a potential free switching contact for an equithermal design an outdoor temperature sensor must be connected to be positioned on the northern side of the bui...

Страница 17: ...e Ecomax control panel The opening in the bottom right hand side corner of the base serves the conducting of the cabling under the boiler s sheet shell L Power supply MS PE N Secondary circuit circula...

Страница 18: ...36 72 25 width height depth Supply voltage 24VDC Maximum input power 5VA Protection to EN60529 IP2X Operating temperature up to 60 C Designed to EN60730 1 2 2001 EMC tested to EN 61000 4 2 EN 61000 4...

Страница 19: ...expansion vessels have been adhered to Note When notifying a defect the present Warranty Certificate must be submitted at all times and the exact address and the circumstances in which the defect occ...

Страница 20: ...plaint proves unjustified i e the defect or leakage of the weldment is not confirmed by the service engineer the lodger of the complaint will be charged with the costs associated with the inspection a...

Страница 21: ...01 Vala sk Mezi Bank details Komer n banka a s account no 1608851 0100 Reg no 47674105 VAT no CZ 47674105 Phone Sales Dept 571 675 589 Secretariat 571 611 250 Production 571 675 405 Sourcing 571 675...

Отзывы: