INSTALLATION
12 / 42
Z800-3000_usermanual_engl_updated_202001.docx
Figure 10: Connect the battery
Figure 11: Mounting the frontpanel
4.
Finally, fit the front panel by reversing the sequence.
5.
Align the mounting bracket (L = left and R = right) with the screw
holes on either side of the UPS system and affix it using the M4
x 8 countersunk screws provided.
6.
Push the UPS system into the rack.
7.
Secure the mounting bracket of the UPS system in the rack (see
Figure 13).
Figure 12: Mounting the brackets
Figure 13: Fitting in a rack
8.
Continue the getting started process (see Chapter 3.6)