3.  Attach a Side Ceiling Plate (36) flat against the 

inside of two Corner Studs (1).  Make sure that the 

gutter on the Side Ceiling Plate is oriented correctly, 

see 

Figure G inset

.  At this point, the completed 

section of the frame will likely need support.

4.  Attach the Rear Ceiling Plate (21) to 

the inside of the two Corner Studs (1) 

that are over the Rear Floor Plate (16).  

Point the Rear Ceiling Plate’s flange inward.  

(See Figure G.)

5.  Attach the Left and Right Rear Studs (8,9) to 

the outside of the Rear Floor Plate (16) and 

Rear Ceiling Plate (21).  Orient them so that 

the ends slope upwards toward the middle 

of the greenhouse.  

(See Figure G.)

Note:

  The heads of the Bolts (43) fit 

into the slot on the back of the Stud, 

holding the Bolts in place during assembly.

6.  Attach the remaining Side Ceiling Plate (36) 

along the other side, flat against the inside of the 

Corner Studs (1), with the gutter oriented properly.

7.  At the side of the Greenhouse:  Attach the 

Rear Right and Rear Left Crown Beams (4,5) 

to the outside of the Crown (35) with the angled 

edges towards the top.  See diagram below, 

viewed from under the Crown, facing back.

8.  Attach the Front Crown Beams (2,3) 

to the Crown (35) in the same fashion 

as the Rear Crown Beams.

9.  Attach an End Cap (47) onto the outer 

end of each Crown Beam (2-5).

10. Attach a Corner Bracket (13) at the top of 

each Corner Stud (1) so that the bracket faces 

upwards, see diagram below.  At the Studs that the 

Rear Ceiling Plate (21) is connected to, the Bolt (43) 

holding the Ceiling Plate on will need to be removed 

temporarily while the Bracket is installed between 

the Rear Ceiling Plate and the Corner Stud.

11.  With two assistants, lift the Crown Assembly 

and place the Crown Beams (2-5) on 

top of the Corner Brackets (13).

12. Attach the remaining Side Ceiling Plate (36) 

flat against the inside of two Corner Studs (1).  

Once again, verify that the gutter on the Side Ceiling 

Plate is oriented correctly, see 

Figure C inset

.  

At this point, the unit should be more stable.

13. Place the Gutter Caps (48) onto the ends of the 

Side Ceiling Plates (36) oriented with a gap in the 

bottom to allow water to drain out of the gutters.

SAFETY

FRAME

MAINTENANCE

FOUNDA

TION

Содержание 69714

Страница 1: ......

Страница 2: ...l personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death Indicates a hazardous situation which if not avoided will result in death or serious injury...

Страница 3: ...ace A concrete foundation is recommended for a high quality installation 9 WARNING The brass bushings inside the Rollers of this product contain lead a chemical known to the State of California to cau...

Страница 4: ...winds or inclement weather Wind and ground conditions may vary from site to site and may affect the practicality and effectiveness of anchoring methods substantially If you have any doubt regarding t...

Страница 5: ...me on the anchors Use a level on the frame to make sure that the anchors are sunk to the proper depth If any anchors need to be raised partially fill the hole under the anchor with sand or gravel 6 On...

Страница 6: ...6 pieces on top of the base you just assembled as shown in the cross section below Fill the base with the fill material up to the top of the 4 x 6 s 4 There are four Floor Plates to position on the fo...

Страница 7: ...nchor holes Blow the concrete dust out from the drilled holes 5 Move the four boards back to the concrete floor surface and align all eight predrilled holes in the four boards with the eight previousl...

Страница 8: ...e the Crown pieces to the rest of the frame Assemble on a clear calm day Wind will damage the Greenhouse and make assembly difficult Assembling the Frame Edges Front Rear Right Left Side Ceiling Plate...

Страница 9: ...Rear Right and Rear Left Crown Beams 4 5 to the outside of the Crown 35 with the angled edges towards the top See diagram below viewed from under the Crown facing back 8 Attach the Front Crown Beams 2...

Страница 10: ...flange facing inward Use the extra Bolt 43 noted in the caption above to secure the center portion of each Diagonal Brace 22 Repeat this Step for the remaining Side Floor Plate and Side Ceiling Plate...

Страница 11: ...Ceiling Plate 23 to the Bolt 43 on the Corner Bracket 13 that is right above the Diagonal Bracket connection Connect the other end to the Left Doorway Stud 7 Attach the remaining Front Ceiling Plate 2...

Страница 12: ...as done earlier 7 Once the door is installed install a Bolt 43 and Nut 52 into the hole on each side of the Door Rail 14 to prevent the door from sliding off its rail Attach the Right and Left Rail En...

Страница 13: ...e Greenhouse Then use Panel Clips 46 in the quantity and location of shown in Parts List A to secure the Transparent Panel in place 4 To attach Panel Clips see illustration and instructions below A Pl...

Страница 14: ...E WARRANTIES OF MERCHANTABILITY AND FITNESS To take advantage of this warranty the product or part must be returned to us with transportation charges prepaid Proof of purchase date and an explanation...

Страница 15: ...ter Door Frame 2 27 Bottom Door Frame 1 30 Side Window Frame 4 31 Door Slider including rollers 1 32 Bottom Window Frame 2 33 Top Window Frame 2 34 Side Floor Plate 2 Part Description Qty 35 Crown 1 3...

Страница 16: ...Rear Center Panel 23 81 x 73 70 1 7A Door Center Panel 23 81 x 9 44 1 8A Top Center Panel 24 21 x 9 13 1 9A Door Panel 23 81 x 23 70 2 Parts List A Panels Record Serial Number Here Note If product ha...

Отзывы: