One Stop Gardens 69714 Скачать руководство пользователя страница 11

Page 11

For technical questions, please call 1-800-444-3353.

Item 69714 

        

Assembling the Front Frame

Figure I:  Front Frame

1.  Attach the Right and Left Doorway Studs (6,7) 

to the Front Right and Left Crown Beams (2,3) 

and the Front Floor Plate (17) as shown above.  

The cutoff corners on the Studs should be at the 

top and should face away from the center of the 

greenhouse. 

(See Figure I and right inset.)

2.  Attach the Front Diagonal Stud (25) to 

the lower Bolt on the Corner Bracket (13) 

and bottom of the Front Floor Plate (17).  

The flange should face inside.  

(See Figure I.)

3.  Attach the other Front Diagonal Stud (25) 

in the same way on the opposite side.

4.  Attach a Front Ceiling Plate (23) to the 

Bolt (43) on the Corner Bracket (13) that is 

right above the Diagonal-Bracket connection.  

Connect the other end to the Left Doorway Stud (7).  

Attach the remaining Front Ceiling Plate (23) 

between the Corner Bracket (13) and Right 

Doorway Stud (6).  

(See Figure I.)

5.  Attach the Top Doorway Beam (12) between 

the Front Right and Left Crown Beams (2,3).  

Turn it so that the nicked corners are facing up 

and the two remaining holes are facing the outside 

to allow the Door Rail (14) to be attached.

6.  Attach the Vertical Extender (19) to the 

Front Left Crown Beam (3) using the 

Long Door Support Bolt (38) and Nut (52), with the 

Door Support Spacer (39) between the Extender 

and the Stud.  

(See Figure I, left inset.)

7.  Place three Bolts (43) in the Slot at the back 

of the Door Rail (14).  Attach the Rail to the 

Top Doorway Beam (12) and the free end 

of the Vertical Extender (19), with the 

rounded side up.  

(See Figure I.)

SAFETY

FRAME

MAINTENANCE

FOUNDA

TION

Содержание 69714

Страница 1: ......

Страница 2: ...l personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death Indicates a hazardous situation which if not avoided will result in death or serious injury...

Страница 3: ...ace A concrete foundation is recommended for a high quality installation 9 WARNING The brass bushings inside the Rollers of this product contain lead a chemical known to the State of California to cau...

Страница 4: ...winds or inclement weather Wind and ground conditions may vary from site to site and may affect the practicality and effectiveness of anchoring methods substantially If you have any doubt regarding t...

Страница 5: ...me on the anchors Use a level on the frame to make sure that the anchors are sunk to the proper depth If any anchors need to be raised partially fill the hole under the anchor with sand or gravel 6 On...

Страница 6: ...6 pieces on top of the base you just assembled as shown in the cross section below Fill the base with the fill material up to the top of the 4 x 6 s 4 There are four Floor Plates to position on the fo...

Страница 7: ...nchor holes Blow the concrete dust out from the drilled holes 5 Move the four boards back to the concrete floor surface and align all eight predrilled holes in the four boards with the eight previousl...

Страница 8: ...e the Crown pieces to the rest of the frame Assemble on a clear calm day Wind will damage the Greenhouse and make assembly difficult Assembling the Frame Edges Front Rear Right Left Side Ceiling Plate...

Страница 9: ...Rear Right and Rear Left Crown Beams 4 5 to the outside of the Crown 35 with the angled edges towards the top See diagram below viewed from under the Crown facing back 8 Attach the Front Crown Beams 2...

Страница 10: ...flange facing inward Use the extra Bolt 43 noted in the caption above to secure the center portion of each Diagonal Brace 22 Repeat this Step for the remaining Side Floor Plate and Side Ceiling Plate...

Страница 11: ...Ceiling Plate 23 to the Bolt 43 on the Corner Bracket 13 that is right above the Diagonal Bracket connection Connect the other end to the Left Doorway Stud 7 Attach the remaining Front Ceiling Plate 2...

Страница 12: ...as done earlier 7 Once the door is installed install a Bolt 43 and Nut 52 into the hole on each side of the Door Rail 14 to prevent the door from sliding off its rail Attach the Right and Left Rail En...

Страница 13: ...e Greenhouse Then use Panel Clips 46 in the quantity and location of shown in Parts List A to secure the Transparent Panel in place 4 To attach Panel Clips see illustration and instructions below A Pl...

Страница 14: ...E WARRANTIES OF MERCHANTABILITY AND FITNESS To take advantage of this warranty the product or part must be returned to us with transportation charges prepaid Proof of purchase date and an explanation...

Страница 15: ...ter Door Frame 2 27 Bottom Door Frame 1 30 Side Window Frame 4 31 Door Slider including rollers 1 32 Bottom Window Frame 2 33 Top Window Frame 2 34 Side Floor Plate 2 Part Description Qty 35 Crown 1 3...

Страница 16: ...Rear Center Panel 23 81 x 73 70 1 7A Door Center Panel 23 81 x 9 44 1 8A Top Center Panel 24 21 x 9 13 1 9A Door Panel 23 81 x 23 70 2 Parts List A Panels Record Serial Number Here Note If product ha...

Отзывы: