![Omron YSC-8361 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/omron/ysc-8361/ysc-8361_instruction-manual_1633449003.webp)
3
2.
POWER CONNECTION AND GROUNDING
2.1
Single phase 220V power connection
Green/yellow wire must be connected to the earth.
2.2
Three phase 380V power connection
3.
CONNECTOR DIAGRAM
4.
OPERATING FIELD P200B
Start tacking
Single start tacking, A is the stitches of forward
sewing; B is the stitches of backward sewing.
They are both in range 1~15
Double start tacking, A is the stitches of
forward sewing; B is the stitches of backward
sewing. They are both in range 1~15
。
End tacking
Single end tacking, C is the stitches of backward
sewing; D is the stitches of forward sewing.
They are both in range 1~15
Double end tacking, C is the stitches of
backward sewing; D is the stitches of forward
sewing. They are both in range 1~15
Free Sewing
▲
As the pedal is stepped forward, the start tacking(if
selected) will be done automatically, then machine will