2
Procedure from installation to operation
Yes
No
No
Yes
Start
Read “Safety precautions”
Pages 4 – 10
Perform installation and
connection Page 15
Check the operation
Page 24
Charge the battery
Page 26
Measure the backup time
Page 26
Operate Page 27
Perform maintenance and
inspection Page 39
Replace the battery
Page 40
Deteriorated battery?
Recharge the battery again
Page 26
* Preparation is complete.
Remove the product from
the package and check
the contents Page 11
Installation/connection
Preparation for operation
Maintenance/inspection
It is possible to omit the backup time measurement step.
Are you
using UPS monitoring
software or contact
signal?
"Using the UPS monitoring
software and contact signal"
Page 46