![Omron NP Series Скачать руководство пользователя страница 93](http://html.mh-extra.com/html/omron/np-series/np-series_introduction-manual_744513093.webp)
4-5 Saving and Loading Projects
4
4
94
NP Introduction Manual
C
rea
ti
ng
S
c
re
e
n
s
2.
Specify the [Look in] location, and select a file name. Click [Open].
The NP-Designer project file will open.
●
Simulation Function
You can make an operation test of the screens by the simulation function. It is not
necessary to connect NP to CP1L.
1.
Select [Tools] - [Test] from the main menu.
Simulation will start.
For details, refer to
NP Series User's Manual
(V096).
●
Programming Console Function
From the NP screen, you can monitor and change CP1L operation.
Select the programming console function from the NP system menu.
For details, refer to
Programming Consoles Operation Manual
(W341).