A Declaration of Conformity for the GRT1-PRT PROFIBUS Communication
Unit can be requested at your nearest OMRON representative.
6-3
Conformance to EC Directives
PROFIBUS units should be installed as follows, for the complete configuration
to meet the EC directives:
1,2,3...
1.
The units are designed for installation inside control panels. All units must
be installed within control panels.
2.
Use reinforced insulation or double insulation for the DC power supplies
used for the communication power supply, internal circuit power supply,
and the I/O power supplies.
3.
The GRT1-PRT PROFIBUS Communication Unit product meets the ge-
neric emission standard. However as EMC performance can vary in the fi-
nal installation, additional measures may be required to meet the
standards. It should therefore be verified that the overall machine or device
also meets the relevant standards. You must therefore confirm that EC di-
rectives are met for the overall machine or device, particularly for the radi-
ated emission requirement (10 m).
Содержание GRT1 - 27-11-2006
Страница 1: ...OPERATION MANUAL PROFIBUS Communication Unit SmartSlice GRT1 Series GRT1 PRT Cat No W04E EN 03 ...
Страница 2: ...SmartSlice GRT1 Series GRT1 PRT PROFIBUS Communication Unit Operation Manual Revised November 27 2006 ...
Страница 3: ...ii ...
Страница 9: ...viii ...
Страница 13: ......
Страница 49: ......
Страница 95: ......
Страница 105: ...86 Explicit Messages Appendix C ...
Страница 109: ......
Страница 111: ......